Dynamic Response of Structures
The primary goal of the third specialty conference on the dynamics of structures was to provide a forum for dialogue between engineers conducting experimental tests and those developing...

Building Motion in Wind
The trend towards higher structural efficiency and hence lower cost has resulted in a generation of lighter and more flexible buildings with a lower inherent capacity for energy dissipation...

Tunnel Ceiling Replaced over traffic
The ceiling of the Holland Tunnel under the Hudson River, connecting New Jersey and Manhattan, was 59 years old and needed replacement, a big job because there are 3 miles of ceiling in...

Postmodern Engineering
Momentum Place is a postmodern skyscraper in Dallas designed by architects John Burgee and Philip Johnson. The Datum-Moore Partnership, structural engineers, designed the structural system...

Diamond Fork Hydroelectric Power Development
The Strawberry Valley Project was conceived in the early 1890s as an irrigation project to supply a maximum of 635 cfs of water from the Strawberry Reservoir through a 3. 8-mile-long tunnel...

Reservoir Sedimentation and Desilting in Taiwan
The island of Taiwan is infested with numerous flashy streams with steep slopes and huge sediment loads, thus, the major reservoirs have experienced heavy sediment deposit. The encroachment...

Air Slot in Tunnel Spillways of Feitsui Dam
The tunnel spillway of the Feitsui Reservoir Project near Taipei has a head drop of more than 110 m, and maximum discharge of 1,500 cms. For prevention of cavitation in the tunnel, an...

The Tunnel that Cleaned Up Chicago
The 1986 Outstanding Civil Engineering Achievement award went to Chicago's Tunnel and Reservoir Plan (TARP) Mainstream Tunnel and Pumping Station. The $975 million project...

Tunneling Around Ft. McHenry
The world's largest underwater tunnel was built out of sight and sound of Ft. McHenry. The 4,000 ft tunnel needed to take I-95 from shore to shore had to be extended to 7,200...

Microtunneling: No Pipe Dream
Microtunneling machines developed in Japan and Germany can help install pipes, ducts and cables without disrupting urban activities at street level. A microtunnel is defined as having...

Geotechnical Data Acquisition and Computerized Analysis
In 1983 and 1984, an exploratory tunnel was constructed as part of the geotechnical exploration program for two highway tunnels to be constructed for the improvement of Interstate 70 through...

SIMSUPER5: Tunneling Construction Simulation
This paper presents SIMSUPER5 (SIMulation SUPERvisor version 5) a computer program developed to simulate the tunnel construction process under conditions of uncertainty. The program determines...

Computerized Construction Progress Control
In 1983 and 1984, an exploratory tunnel was constructed as part of the geotechnical exploration program for two highway tunnels to be constructed for interstate 70 through Glenwood Canyon,...

Wind Effects on Compliant Offshore Structures
In recent years modern experimental and analytical techniques for estimating wind effects have increasingly been applied to compliant offshore structures. The six papers included in this...

Downtown Traffic Goes Down Under
Seattle's 1980 employment population of 124,000 is expected to jump to 150,000 by 1990. This will mean more commuter traffic and more mass transit coming into the city's...

Tunnel and Bridge Construction with Minimum Disturbance to Overhead Services
The rapid growth of pipe jacking over the last 20 years and the improvement and development of methods in terms of lengths of drive, size and ability to work in varying ground conditions...

Hydraulic Design of the Strontia Springs Diversion Dam
The hydraulic features which were of primary significance for the project were the diversion tunnel and spillway. The low-level outlet valves and water-supply intake were relatively straight-forward...

Soldier Creek Dam Foundation Drainage
A possible mode of failure for Teton Dam, piping of erodible core material through unsealed foundation joints, was also concluded as being possible at Soldier Creek Dam, Utah. Evaluations...

Application of a Three-Dimensional Coupled Finite Element?Boundary Element Method
Three-dimensional conditions in underground construction occur at the face of a tunnel, at intersections of underground openings and around roughly equidimensional openings. As long as...

Hydropower
Recent Developments
The Foothills Project has been under consideration by the Denver Board of Water Commissions for many years. It is one of the major steps in the continued efforts of the Board to provide...

 

 

 

 

Return to search