Becoming Greener with Green Sand: An Iron Castings Company Devises an Environmentally Friendly Liner System Reusing Foundry Byproduct
Metalcasting is one of the oldest methods of recycling�humans have a few millennia worth of experience with the technique�but today's industry still battles public preconceptions...

Introduction
The purpose of this white paper is to: foster understanding and transparency of analytical methods necessary to update and describe climate, including possible changes in the frequency...

Journal of Sustainable Water in the Built Environment
The Journal of Sustainable Water in the Built Environment presents activity and research developments in water issues, challenges, and opportunities throughout the developed landscape. The scope covers...

Bill Shannon and Stan Wilson: Geotechnical Pioneers with a 60-Year Legacy
Starting a business today can pose an array of challenges�planning, financial, legal, and licensing among them. But at its core, a company's founders must be dedicated to...

Design Considerations Common To All Permeable Pavements
Impervious cover in watersheds without controls result in increased stormwater runoff and decreased groundwater recharge in response to rainfall events. This increased runoff can be the...

Alternative Technologies
In recent years, new permeable pavement product variations have entered the market. This chapter describes general characteristics for several emerging products. The following types of...

Achieving Success and Avoiding Failures with Permeable Pavements
This chapter provides experienced-based recommendations on how to achieve success with permeable pavements. This information is based on an informational survey completed by designers,...

Hydrologic and Hydraulic Design Methods
Computational methods for hydrologic analysis, hydraulic functions, and treatment capacity of permeable pavements vary depending on the complexity of the design and level of detail in...

Quality Assurance/Quality Control
The contract between the purchaser and the supplier shall state the responsibilities of each party and the conditions under which the work will be accepted or rejected....

Initial Criteria
Microtunneling is appropriate for a wide range of conditions. Careful evaluation of certain parameters will determine the applicability and constructability of a potential microtunneling...

Preliminary Geotechnical Considerations
In the planning phase of the project, a preliminary geotechnical investigation should be performed to identify the general subsurface conditions and any special subsurface conditions....

Project Layout
Microtunneling projects should be laid out with attention to the benefits and constraints unique to this construction process. The following recommendations address some of these concerns:...

Cost Considerations
Cost is an important consideration when comparing microtunneling with other construction methods. Direct costs should not be the only consideration. Microtunneling has other benefits that...

Microtunneling Equipment
A discussion of microtunneling equipment in the context of the design aspects of a microtunneling project is applicable only to the extent that the engineer must set forth in the contract...

Microtunneling Design Elements
The design elements and the process for a microtunneling project are generally the same as for other underground projects. Design elements include the following: General conditions; Special...

Shaft Considerations
Jacking and receiving shaft locations should be selected to minimize the number of shafts and disruptions while not exceeding the practical limits of the drive lengths achievable for a...

Contract Documents
As with any civil works project, the bid and contract documents prepared by the owner and the engineer should provide the contractor with the necessary information to prepare bids, to...

Field Aspects
As soon as practical after their arrival at the project site, all pipes, fittings, and appurtenances should be thoroughly checked for compliance with the contract documents and accepted...

Microtunneling Operation
The shaft should provide safe working conditions and fully support the ground. Jacking and receiving shaft support system and sizes are typically determined by the contractor. See Chapter...

Submittals
The contractor should submit the items listed in the specifications for review and acceptance by the engineer. The submittals are generally divided into preconstruction and postconstruction...

 

 

 

 

Return to search