World Marina '91
This proceedings, World Marina '91, consists of papers presented at the First International Conference held in Long Beach, California,...

Dam Foundation Grouting
Dam Foundation Grouting provides its readers with background information that will help them deal more confidently and effectively with the...

Knowledge Acquisition in Civil Engineering
Expert systems are an intriguing approach for transferring valuable problem-solving skills from the minds of human experts to the logic of computer programs. For the past several years,...

Some Insight in Autoregressive (AR) Spectral Modeling
The difficulties associated with the determination of reliable autoregressive (AR) approximations of the Pierson-Moskowitz and Davenport spectra are examined from the standpoint of developing...

Development of Reliability-Based Integrated Design-Construction Quality Assurance System of Penstock
A more rational design-construction quality assurance system is proposed by applying the concepts of the reliability-based design methods. By applying this system, the design level of...

Safety Plans for Buildings, Structures and Technical Facilities
Safety is an important quality feature and depends on all activities within the building process. The safety concept must therefore consider all phases of the building process, from the...

America's Irrigation: Can It Last?
Although irrigated agriculture has made a substantial contribution to food production and the economy in the U.S., its future is now at a crossroads for a variety of reasons. Irrigation...

U. S. Nuclear Regulatory Commission's High-Level Waste Repository Licensing Program and Regulatory Strategy
The U. S. Nuclear Regulatory Commission (NRC) High-Level Waste Repository Licensing Program during the pre-licence application phase consists of activities in the following four areas:...

DOE Perspectives on the Regulatory Framework of the Civilian Radioactive Waste Management Program
Key statutes, regulations, and orders that govern the radioactive waste management program are identified. Current and recent regulatory activities are described in the areas of meetings,...

Implementation of NUREG 1318 Guidance Within the Yucca Mountain Project
The U. S. Department of Energy's Yucca Mountain Project is implementing a quality assurance program that fulfills the requirements of the U. S. Nuclear Regulatory Commission...

Evaluation of the Canadian HLW Disposal Program?Performance Assessment Aspects
The inception and development of the Canadian HLW disposal program are described, showing its basis in the multi-barrier system concept and noting the mechanisms in place for its evaluation...

The Technical Review Group: An Application of the Quality Assurance Program Descriptions for Defense High-Level Waste Processing
This paper describes the formation of a technical review group (TRG) as an early application of the quality assurance program for high-level waste processing. The objectives and functions...

Assuring Quality Measurements of Environmental Radioactivity for a High Level Waste Repository
Federal agencies have ordered detailed quality assurance documentation in procedures used for measuring environmental radioactivity during the site characterization phase at the proposed...

Requirements for Controlling a Repository's Releases of Carbon-14 Dioxide; The High Costs and Negligible Benefits
A repository excavated within the unsaturated zone may release carbon(C)-14 dioxide in amounts that exceed limits imposed by the Environmental Protection Agency (EPA) and the Nuclear Regulatory...

Assuring Data Quality for Use in Waste Management System Trade-Off Studies
This paper details the systems engineering approach developed to ensure the integrity of a large data library throughout its development and application. The paper assesses the benefits...

Data Quality Assurance Controls Through the WIPP in Situ Data Acquisition, Analysis, and Management System
Assurance of data quality for the in situ tests fielded at the Waste Isolation Pilot Plant is of critical importance. These tests supply the information for development and verification...

Challenges and Opportunities in the '90s and Beyond?A U.S. Army Corps of Engineer's Perspective
In the foreseeable future, water resources expenditures will probably be dominated by environmental/water quality concerns. Strong focus is coming to bear on the state of repair, rehabilitation...

Realities of Infrastructure Financing
Federal financing of water supply and water treatment projects will continue to decrease as capital demands continue to increase for expansion of water supply, to replace aging systems,...

Legal Issues Presented by the Regionalization of a Water System
The joint development of a water supply and related infrastructure ('regionalization') by independent municipal and private entities presents legal and institutional...

A Travel Time Template for Water Body Field Surveys
A LOTUS 1-2-3 spreadsheet application has been developed to help plan water body surveys. The template calculates travel times between sampling stations and outputs a time schedule for...

 

 

 

 

Return to search