Control System Design Considerations for Small Hydro Projects
This paper deals with the philosophy that must be embraced when specifying a fast track small hydro project. The major areas discussed are: the role of control systems in the context of...
Nanpil River Hydropower Project Pohnpei, Federated States of Micronesia
The Nanpil River Hydropower Project is a 1600 KW run-of-the-river hydropower project located on the tropical island of Pohnpei, Federated States of Micronesia. The hydropower project will...
Electrical Design of Small Hydro Plants
Major aspects of electrical design criteria for small hydro power plants used in co-generation schemes are: turbine control, generator and excitation equipment selection, protection relaying,...
Thermal Monitoring of Leakage Through Dams
The technique involves very accurate temperature measurement at shallow depth below the reach of the surface diurnal cycle. Temperatures respond to subsurface water movement (with advective...
Carmen-Smith Uprate & Modernization
The Carmen-Smith Powerhouse is located on the upper McKenzie River, 75 miles northeast of Eugene, Oregon. Carmen's two nearly identical 42. 1 MVA vertical hydroelectric turbine...
Modernization of Existing Hydroelectric Power Stations in Conjunction with Conversion to Automatic Operation
The easiest and, in the long run, the least expensive method in most cases is the installation of an electronic turbine governor that is not only easy to incorporate in the power station...
Analysis of Expanding the Wolf Creek Powerplant
The Nashville District, Corps of Engineers, is examining the feasibility of expanding the Wolf Creek powerplant to increase its peaking capability. The economic analysis of peaking expansions...
Performance Consideration for Selecting a Static Excitation System
Many hydropower plants today are being upgraded with new static exciter/regulator systems to replace the old existing rotary exciters. One type of system is the semi-inverting system where...
Siphon Penstock?An Economic Way to Develop Hydros
As part of the 48 MW Jim Falls Hydro Redevelopment Project by Northern States Power Company, a minimum flow powerhouse was constructed with a siphon penstock. The Minimum Flow Unit (MFU)...
Competitive Model Testing for Replacement Runners at the Wells Hydroelectric Project
The Wells Hydroelectric Project, located on the Columbia River, contains ten Kaplan-type turbines. The plant has been in commercial operation since January, 1969. The runners have a long...
Application of an Integrated Numerical System for the Modernization of Hydro Turbines
The modules of an integrated numerical system for the new design and replacement of hydro power plant components are described and some examples of application are shown. The main modules...
Dust Control at Canyon Ferry
Since initial filling of Canyon Ferry Lake in 1955, wind blown, fine grained material from exposed flats at the upper end of the lake became a problem of increasing concern. Average deposition...
Public Involvement Strategies: A Case Study in Citizen Participation
Literally millions of dollars are wasted every year because authorized and funded water projects are stalled in court, hung up in administrative proceedings, or delayed while the project...
Planning for Small-Scale Hydroelectric Development: A State Response
A 'surplus' of power in the Pacific Northwest region of the country has brought with it a declining interest in the generation of new electrical energy supplies....
Determination of the Effects of Multiple Small-Scale Hydroelectric Projects on Resources in a California River Basin: A Matrix Approach
In 1983, Section 306 of the Energy and Water Appropriation Act required the FERC to conduct a comprehensive water resource analysis in the Upper San Joaquin River Basin, California. A...
Wilderness Hydrometeorological Study in the Colorado River Basin: A Case Study in Natural Resource Conflict Resolution
This paper describes the formation and progress of the Interagency Committee on Wilderness Hydrometeorological Data Collection (ICWHDC). It highlights how the ICWHDC is attempting to resolve...
Oxygenation of Releases from Richard B. Russell Dam
In July 1972, the Georgia Department of Natural Resources requested the formation of a technical committee to analyze the water quality matters relating to the Russell project. Studies...
Gas Bubble Disease in Trout Below a Low Dam
Research and efforts to reduce nitrogen supersaturation which is affecting trout in the Bighorn River, Montana, below Yellowtail Afterbay Dam is described. Nitrogen supersaturation can...
Study of River Stage Fluctuations Resulting from Possible Operations of the Susitna Hydroelectric Project
Operation of the project to follow load may result in discharge and river stage fluctuations which could affect habitats and fish food sources. Limitations on hourly, daily, and weekly...
Fish Screens for Hydropower Developments
The paper reviews five screening systems that are now being used at hydropower developments. The screen types discussed have a demonstrated ability to meet agency fish screening criteria....