Into the Fourth Dimension
A team of contractors designed a pharmaceutical plant entirely in 3-D CAD, then linked the renderings to a cost program and scheduling software, adding a fourth dimension�time�to the process....

Guidelines for the Seismic Evaluation and Upgrade of Water Transmission Facilities
Prepared by the Technical Council on Lifeline Earthquake Engineering of ASCE This TCLEE Monograph provides guidelines for the seismic evaluation and...

Energy Unleashed
The U.S. Army Corps of Engineers discharges a mean daily flow of 2,000 cu ft/s (57 m�/s) under a gross head of 280 ft (85 m) through four Howell-Bunger valves at the Summersville Dam in...

Use of Optimization Techniques to Evaluate Ground-Water Management Strategies in the Central and West Coast Basins, Los Angeles County, California
The U.S. Geological Survey and the Water Replenishment District of Southern California are engaged in a cooperative study of the geohydrology, geochemistry, and ground-water management...

Simplification of Detailed Models of Water Distribution Systems Obtained from GIS Systems
For a long time simplified models have been used to simulate the behaviour of large water distribution networks. Often, simplification has been carried out by removing small diameter pipes...

Theoretical and Empirical Implications of Increasing Block Rates
(No paper) The U.S. Army disposed chemical agents, laboratory materials, and unexploded ordnance at the O-Field landfill from before World War II until at least the 1950s. Soil, ground...

Friction Factor Choice in Hydraulic Simulation Models: Does It Matter?
(no paper) To model water distribution systems using computer hydraulic simulation, a user is required to select a form of head loss-flow relationship for each pipe in the network. The...

Community Participation in the FEMA FIS Process: A New Way to Go
(No paper) As an experienced FEMA Study Contractor (SC), there are numerous items of interest that the community could participate in to facilitate the Flood Insurance Study (FIS) process....

Comparison of Complete Modeling/Simplified Modeling of Zaragoza City Water Supply Network
(No paper) Zaragoza is a Spanish city with 600.000 inhabitants and a water supply network of 900km long. The Council technical services uses a Microstation based GIS, GRED, for network...

Saving San Antonio
During an October 1998 flood, excess flow from the San Antonio River was funneled into a 3.1 mi (5 km) long, 24 ft (7.3 m) wide concrete-lined tunnel beneath the city that emptied into...

Under Pressure
The Arrowhead East and West contracts for the Inland Feeder water conveyance system being built in California consist of 51,500 ft (15,700 m) of tunnels that cross the San Andreas Fault...

Main Line Mending
Both the Washington Suburban Sanitary Commission (WSSC), of Laurel, Maryland, and the Providence Water Supply Board, of Rhode Island, are conducting massive, multimillion-dollar rehabilitation...

Relining a Relic
By the mid-1980s most of the Boston Low Service water supply network had been in operation for more than 100 years�with little regular maintenance. Many of the system's air...

Conquering the Cold
Three projects�a water treatment plant, an airport, and a hydroelectric plant�illustrate how practicing engineering in Alaska differs from working in the contiguous 48 states. Permafrost,...

Conquering the Mountain
Interstate 26 will be the largest and most expensive highway project ever undertaken in North Carolina. When completed in 2002, I-26 will provide safe and efficient interstate passage...

When the Levee Inflates
Rubber dams�long, flexible tubes, anchored to a concrete base and abutments and inflated with air or water�have been used since the 1950s, but installations have risen as technology has...

Probing Pipelines (available only in Geoenvironmental Special Issue)
Inspecting underground pipelines has become easier, more effective and less intrusive through use of sonar, radar, lasers and seismic and acoustic testing. To replace simple visual inspection,...

Building Knowledge (Available only in Structural Engineering Special Issue)
The Integrated Teaching and Learning Laboratory (ITLL) at the University of Colorado provides hands-on engineering lessons for students. Electrical, HVAC, structural, illumination, and...

Putting Wetlands to Work
Wetlands, whether natural or engineered, have enormous potential to clean up wastewater, but in the past, the public called on civil engineers to drain wetlands en masse as a public benefit....

Cliffside Correction
Construction of a 10 km sewer collector in Valpara�so, Chile, came to a halt due to construction difficulties experienced during pipe jacking operations. Analysis revealed not only construction...

 

 

 

 