The Psychology of Business Development
A successful marketing-oriented firm that is service-minded will have its entire staff involved in selling at different levels. This includes how phones are answered as well as how proposals...

Water Quality Regs: Staying Ahead
After a century in which water utilities could stay well ahead of most regulations simply by being responsible, professional organizations, they now seem to be playing catchup in a game...

Bridge to the Past
Constructed by Maya builders during the seventh century, the PreColumbian bridge at Yaxchilan was the longest in the world for over seven hundred years. Little remains today of this unique...

Rocky Mountain HOV
In 1988, Colorado DOT and the firm of Daniel, Mann, Johnson, & Mendenhall, Denver, the oversight consultant on the project, set out to bring the highway up-to-date and promote...

Engineers and ADA
When it comes to the Americans with Disabilities Act, design professionals have special liability concerns. Engineers not only have to ensure that clients meet the act's stringent...

Down-to-Earth Terminal Design
From New England to the Pacific Northwest, airport terminals in the 1990s are being designed and built to meet foreseeable demand--with very little uncommitted space. The speculative nature...

Selecting Tower Cranes
Looming over the skyline like steel dinosaurs, tower cranes can look deceptively similar. But these beasts of burden are not a homogenous species, and selecting and positioning the right...

Touchdown for O-Cell Test
The Los Angeles Memorial Coliseum was badly damaged by the Northridge earthquake. There was seven months to complete 3 years of work to be ready in time for football season. The project...

Soft Ground Not Easy Ground for TBM
The King County Department of Metropolitan Services (formerly called Metro), faced with the need to transfer wastewater from the West Seattle drainage basin to a secondary treatment plant...

What Price Congestion Management?
Congestion pricing--the idea that, when more people want to use a road, they should pay (or pay more) for the privilege--was dismissed in the 1950s and rejected in the 1970s in the U.S....

Functional Highway Design
In the past, the common highway design development process used by government agencies has often failed to incorporate the lessons learned from operational experience and research. However,...

Northridge Postscript: Lesson on Steel Connections
Immediately after the Northridge earthquake in January 1994, the general concensus was that steel-framed buildings performed extremely well. Later, inspectors were surprised to find weld...

Ports '95
This proceedings, Ports '95, is a collection of the technical papers presented at the Ports '95 Conference held in...

Guidelines for Cloud Seeding to Augment Precipitation
This manual of professional practice, Guidelines for Cloud Seeding to Augment Precipitation (ASCE Manual No. 81), is the outgrowth of a committee report by the same...

Trenchless in San Diego
The Middletown Trunk Sewer is located near downtown San Diego. Sewage backups prompted a study, recommending construction of a larger replacement pipeline. The City of San Diego prepared...

A Safer Earthquake Design Code After NorthRidge
Three recent killer California earthquakes have demonstrated serious deficiencies in our current building codes. As they do after all such events, officials in California and other states...

Shotcrete for Underground Support VII
This proceedings consists of papers presented at the Shotcrete for Underground Support VII Conference held in Telfs, Austria, June 11-15, 1995. It covers three broad themes concerning...

Hydraulic Design of Flood Control Channels
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers, No. 10. This guide presents procedures for the design analysis...

Bridge Design: Reality Bites Back
Many bridge engineers tend to ignore the process nature of reality, the fact that everything in this universe changes from moment to moment. When they are given the responsibility for...

Advances in Underground Pipeline Engineering II
The first international conference on Advances in Underground Pipeline Engineering was held in 1985. Some 50 authors and over 300 delegates from 20 countries took part in the presentations...

 

 

 

 

Return to search