Arctic Offshore Site Investigations
The continuing search for new petroleum sources has led to increased exploration activity in the arctic offshore regions of Alaska. The general approach to site investigations has been...

Single Point Moorings for the Bering Sea
Multi or single-legged buoy systems such as conventional CALMs or SALMs would not survive the winter season in the Bering Sea because the forces generated in the anchoring chains by pack-ice...

Snow Effects on Pile Design Temperatures
The construction of North Slope aboveground pipelines and gathering lines is generally from snow workpads constructed proximate to existing access roadways. The pile support centerline...

After Action Report 1983 California Coastal Storms
The winter of 1982-1983 saw some dramatic changes in the worldwide weather patterns that have been attributed to the anomaly known as El Nino. During that winter California was attacked...

The Recovery of Monterey Bay Beaches After the Winter Storms of 1982-83
The El Nino conditions of 1982 and 1983 produced unusually frequent and intense storms along the central California coast. These storms produced much greater than normal beach erosion...

A Preliminary Study on the Comprehensive Exploitation of Coast Zone Resources in the Southern Fujian
The Pacific tidal wave intrudes the South China Sea through the Bass Strait and travels northward as an 'upgoing wave' to Taiwan Strait affecting the Southern...

Record Bridge Replacement
Jacks Run Bridge had to be rebuilt in one year instead of the usual two to three. So the Pennsylvania Department of Transportation spearheaded the quickest replacement of a major bridge...

Bridging Twin Ports
The Major Richard I. Bong Memorial Bridge, part of U. S. Highway 2, connects harbors at Duluth, Minn. and Superior, Wisc. The new highway link was designed to relieve congestion on nearby...

River Lock Rehab: A Winter's Tale
Lock & Dam �1 on the Mississippi River between Minneapolis and St. Paul had deteriorated badly but the U.S. Corps of Engineers determined that replacement with a new structure...

Winter Snowpack Augmentation in Utah
The snowpack enhancement cloudseeding program in Utah was operated continuously for ten consecutive years prior to the 1983-84 water year. It was designed to augment water supplies in...

The SNOTEL Data Acquisition System Design, Operation, and Uses
The Soil Conservation Service (SCS), U. S. Department of Agriculture, coordinates measurement of the winter snowpack in the Rockies, Sierra Nevada, Cascades, and other major mountain ranges...

Superplasticized Concrete Takes Off in Dallas
Some engineers are calling superplasticized concrete the most important advance in concrete technology in over three decades. Over the past four years superplasticized concrete has begun...

Preparation of Equipment for Cold Regions
An overview of equipment required to support arctic construction is presented. Special features which have been incorporated into standard equipment designs are explained. Also presented...

Cold Regions Safety
Presented here are some essential basics for the development of a comprehensive cold regions safety program. The intent is to cover a few topics in some detail, and to increase the general...

Top Foreign-Born Civil Engineers Speak Their Minds
Six distinguished civil engineers born and educated abroad discuss their careers and explore: the differences in the civil engineering marketplace and in the public image of the CE here...

Modern Engineering Saves Troubled Dam
A badly deteriorated and potentially unsafe dam has been recycled. The 135-ft-high, 300-ft-long LaPrele Dam is a concrete slab-and-buttress structure. Its sloping face slab has leaked...

Winter Roads and Ice Bridges
In order to realize development of the La Grande hydroelectric complex in the James Bay Territory of northern Quebec Province, Canada, the cold weather had to be capitalized on for construction...

Steel Frame, Precast Floors Meet Impossible Time Constraints
Only 13 months were allotted for expansion of the Captain Cook Hotel in Anchorage, Alaska, which meant that construction would have to continue through the winter months with little down...

Anchorage Port Survives Nature
Engineering at the Port of Anchorage was complicated by severe ice conditions, extreme tides, a current up to 5 knots which carries a severe ice floe, and poor foundation conditions at...

 

 

 

 

Return to search