Measurements to Calibrate Suspended Sediment Model for Adsorbed Contaminant Transport Study of North Fork Holston River, Virginia
A daily suspended sediment (SS) and mercury transport model was developed for a 25-mile reach of the North Fork Holston River below Saltville, Virginia. Daily streamflow measurements;...

A Real-Time Traffic Diversion Model: A Conceptual Approach
The development of a real-time traffic diversion control system for integrated freeway and arterial networks, as part of the most currently envisioned Intelligent Vehicle/Highway System...

The Use of Submersible ROVs for the Inspection and Repair of Water Conveyance Tunnels
At Virginia Power's Bath County Pumped Storage Station, robotic technology was pioneered through the development of a purpose-built Remotely Operated Vehicle (ROV) to gain...

Circulation Between I-664 Channel Islands, James River, Virginia
This paper compares information presently available concerning the maximum currents between the I-664 Channel Islands in Hampton Roads, Virginia, before and after construction of the islands....

Land Management and Water Yield in the Appalachians
Watershed treatments on the Fernow Experimental Forest have included individual tree selection, commercial clearcutting, clearcutting upper and lower halves of watersheds, clearcutting...

Site Characterization of Yorktown Formation for New Accelerator
The design of a new 1700-m long continuous-wave electron beam accelerator facility (CEBAF) in Newport News, Virginia demanded an extensive geotechnical exploration program be conducted...

Foundations on Expansive Soils in Northern Virginia
Thick layers of clayey silts (MH) were observed at several sites where townhouse developments were planned. These deposits had a high shrink swell potential. Maximum swell pressure tests...

Jet Grouting to Construct a Soilcrete Wall Using a Twin Stem System
An existing coal loading pier located in Norfolk, Virginia was completed in 1961 for the purpose of loading ocean going ships. It was determined that dredging adjacent to the pier would...

Temporal and Spatial Variations in Shoreline Migration Rates, Metompkin Island, Virginia
Examination of historic shoreline position changes provides a mechanism for evaluating the influence of spatial and temporal variations in barrier island morphology on the long-term evolution...

Sediment Transport Processes at Sandbridge, VA
Sandbridge Beach is a primarily residential community located along a 7 km reach of narrow barrier beach. Rates of erosion in this area historically have been high, reaching as much as...

Disinfection of Wastewater Effluents with Electron Radiation
A full scale electron irradiation unit is being tested at the Virginia Key Wastewater Treatment Plant in Miami, Florida. On-going experimentation is evaluating the use of high energy electrons...

Interstate Water Management: Implications of Recent Virgina/North Carolina Conflicts
Attempts to expand the public water supply of the urbanized southeastern corner of Virginia by transferring water from an interstate river flowing from Virginia into North Carolina has...

Underwater Tunnel Inspection by Virginia Power Using a Submersible Robot
The Bath County Pumped Storage Station, has three large tunnels linking the upper and lower reservoirs. The 'Hydrover' submersible remotely operated vehicle (ROV)...

Vessel Induced Physical Effects in a Navigation Channel
The U.S. Army Corps of Engineers is investigating ways to improve lockage efficiency at the Marmet Locks on the Kanawha River, West Virginia. A physical effects prediction model have been...

Underwater Tunnel Inspection by Virginia Power Using a Submersible Robot
The Bath County Pumped Storage Station, jointly owned by Virginia Power and Allegheny Power systems and operated by Virginia Power, has three large tunnels linking the upper and lower...

Intake Towers and Outlet Tunnels Adapted for Hydro
An intensive design project was undertaken with the objective of retrofitting two U.S. Army Corps of Engineers (COE) dam sites for hydroelectric power generation. The challenge of designing...

Design Considerations for a Penstock Located in an Outlet Tunnel at the Jennings Randolph Dam in West Virginia
The proposed production of hydropower at this flood control-recreation dam involves the installation of a 78 inch diameter steel penstock at the crown of the existing tunnel. The penstock...

Hydraulic Model Tests of Flow around Penstock Suspended inside the Tunnel for Design of a Small Hydro
The proposed hydropower project in the State of Virginia involves design and construction of a steel penstock hung from the crown of an existing outlet tunnel at this U.S. Army Corps of...

An Evaluation of the Applicability and Cost of Polyester Resin and Cementitious Grouts for the Installation of Rock Anchors at Hydro Projects
The success of two proposed hydropower projects in the States of Virginia, and West Virginia depended on the ability of a rock anchor system to support the penstocks at the crown of the...

Design and Installation Concepts for High Capacity Pump/Turbines
This paper discusses the pre-planned field welding and machining operations utilized for six (6) large pump/turbines, each capable of 508 MW at Virginia Power Company's Bath...

 

 

 

 