Plunge Pool Erosion in Cohesive Soils at Two Dams in Kansas
Results of a field study of two plunge pools scoured by horizontal pipe outlets discharging on cohesive channels are analyzed. Formulas for critical tractive shear stress based on plasticity...

Sedimentation Study for the Rochester, Minnesota, Flood-Control Project
In a cooperative effort, the U. S. Army Engineer District, St. Paul (NCS), and the Soil Conservation Service (SCS) planned a combined flood-control project. The SCS portion of the project...

Upper Hudson River Valley Dam Break Model
In order to determine areas of inundation due to the failure of Conklingville Dam, a dam break analysis was performed, and the resulting outflow hydrograph was routed through the downstream...

Predicting Ground-Water Drainage to Surface Mines
A two-dimensional, finite-difference numerical model is used to simulate the drainage of ground water into a surface coal mine. Graphs of dimensionless head as a function of dimensionless...

Vacuum Assisted Pipelines Operation
In the process of upgrading the sewerage facilities for Lancaster, Pennsylvania, it was decided to combine two existing facilities into one new facility. This required the design of three...

Milwaukee Sewerage District Interplant Pipeline
The pipeline is intended to transfer solids between the Jones Island and South Shore treatment works a distance of approximately 12 miles (19. 3 km). The 4 conduit pipeline comprising...

Hydrotest Rupture of Penstuck Liner at Bath County
Bath County is the construction site of Virginia Electric and Power Company's pumped storage project. Rupture of a penstock liner during hydrotest at high pressure threatened...

Willow Creek Dam--To Be or Not To Be
In Heppner, Oregon, several alternatives for flood control were considered. A concrete gravity dam constructed using roller compaction methods was selected because of the greatly reduced...

A Nebraska Power District's Experience in Stabilizing by Silt Injection
The structures, rolled earth and concrete, of the Central Nebraska Project are constructed on foundations of loessial soils that range from a few feet to more than 100 feet in depth. The...

Local Scour at Fish Rocks
There is a growing interest in the enhancement of rearing habitat for juvenile anadromous fish in the Pacific Northwest. This has focused attention on the need for a better understanding...

Willamette River Adjustments to New Spur Dikes
Severe bank erosion has caused recent local losses of up to 30 ft (9 m) per year of prime agricultural land along a half-mile (800 m) reach of the Willamette River, Oregon. The U. S. Army...

Intake-Shoaling and Pump-Vibration Problems
Iowa Generation's Council Bluffs Unit 3 circulating water-intake structure has experienced two major problems: (1) formation of sand bars in front of the trash racks during...

Passive-Intake System for a Shallow Sand-Bed River
The Jeffrey Energy Center draws its cooling water make-up from the Kansas River near Belvue, Kansas. At this site, the Kansas River is a shallow sand-bed river of constantly changing bottom...

Design Accuracy of Stormwater Detention Basins
While the stormwater detention basin is the most frequently used method for controlling runoff from developing areas in the United States, there appears to be no statement of the probable...

Adjustable Speed Pumping for Irrigation Networks
Adjustable speed technology can be an economically viable method of accommodating the significant fluctuations in flow and pressure produced by certain irrigation networks. Combinations...

Aeration is the Solution for Sluice Cavitation Damage at Libby Dam, Montana
Cavitation has severely damaged two of the high-head flood control sluices. The damaged areas were immediately patched; however, these patches were not considered a solution to the problem....

Physical Hydraulic Modeling for a Small Hydroelectric Redevelopment
In the development of a small hydroelectric project, the operating head on the plant is usually limited. On these projects, the need to minimize head losses and eliminating other factors...

Streamflow Measurement and Analysis for Northwest Rangelands
Watershed hydrologic and sedimentation investigations on the Reynolds Creek Experimental Watershed in southwest Idaho were initiated in 1960. Major objectives of the watershed research...

CN Approach to Water Budgets for Small Watersheds
In some states, issuance of a surface mining permit is dependent upon an assessment of the current hydrologic baseline of the area to be mined and of the probable future impacts of mining...

Decision Making in Establishing Instream Flow Needs in Minnesota
Allocation of water for instream use depends upon how well the need and justification for instream flows can be communicated to decision makers. The analysis and presentation of instream...

 

 

 

 

Return to search