Santa Ana River Project Overview
The Santa Ana River Project, authorized for construction by the Water Resources Development Act of 1986, is designed to provide urban flow protection to the growing communities in Orange,...

Application of Geographic Information Systems for Flood Risk Mapping
This paper presents an overview of the Federal Emergency Management Agency's (FEMA) efforts to automate flood risk mapping performed in support of the National Flood Insurance Program...

GIS Applications to the Water Resources Development Program of the U.S. Army Corps of Engineers
The ability that a Geographic Information System (GIS) offers to quickly reference multiple data sets to an overall base map and to one another provides the potential opportunity to greatly...

Jet Injection Model Studies for the City of Los Angeles
The Hypersion Treatment Plant for the City of Los Angeles is currently undergoing an expansion project. A major component of this system is a sludge recycling system. And it is essential...

Southwest Pass Training Structure Alternatives
The U.S. Army Engineer Waterways Experiment Station system of computer programs, TABS-2, was utilized to evaluate various structural plans for increasing channel velocities and sediment...

A Rational Approach to Selecting an Optimal Design Storm for Flood Control
A rational methodology is presented herein for determining the optimal design storm frequency when planning for flood protection in new urban areas. The technique was developed from an...

Effectiveness of Wet Detention and Retention Ponds for Improving Stormwater Quality
The most commonly used structural measures for stormwater quality management and control are retention basins, wet detention ponds, and detention with filtration ponds. This paper explores...

Risk Assessment of System of Dams
The application of risk assessment to a series of dams on a river is presented here. A general discussion of the basic principles of risk assessment approach to dam engineering is given...

Elements of a Coastal Stormwater Drainage System
Several elements in the design of a stormwater drainage system that outfalls to the ocean are discussed. The paper discusses a study conducted of the Ocean Lakes Watershed near Myrtle...

Status of Hydropower Development at Corps of Engineers Dams
The Corps of Engineers is the largest single supplier of hydroelectric power in the United States with 74 projects and an installed capacity of 20,839 MW. In addition, 33 Corps projects...

Project Evaluation?Don't Miss the Boat
The hydroelectric developer is faced with many decisions during the evaluation stage. These include determining the size of the project, financial analysis to be used, type and number...

Hydropower Development under the Utility Concept of Least Cost Utility Planning
The impetus behind 'Least Cost Utility Planning' (LCUP) is that if new generation or purchased power could be deferred, the resultant savings could be used to...

Determining Hydro Project Dependable Capacity
Traditional techniques for estimating a hydro project's dependable capacity are of limited value when evaluating a hydro project in a thermal-based power system. For such...

Important Aspects of Annual Energy Calculation Techniques for Low Head Hydro Power Plants
Annual energy calculations are frequently used to optimize design parameters at a turbine site and to compare energy production based on equipment offers from various suppliers. In this...

Simulations of Multireservoir System Operation
Simulation modeling has evolved from a direct examination of operating policies into operational decision support systems, integrated multiple use expansion planning systems and special...

How Many Years to Fill with Sediment, a Sediment Study of Lake Powell on the Colorado River
A study to determine the current capacity and to update information on the life expectancy of Lake Powell was conducted by the Bureau of Reclamation. The study documented the present storage-elevation...

Management System for Power Plants Tecaid Maintenance System
Operational conditions and production levels are maintained at consistently higher levels when a planned maintenance system is used. Initial operational expenses for a planned maintenance...

Design and Construction of the Moose River Hydroelectric Project
The project's main features are: a 7 ft high, 240 ft long cast-in-place concrete overflow weir; bell mouth entrance concrete intake structure with trashrack and trashrake;...

China's Ertan Hydroelectric Project
Ertan will be a major hydroelectric project on the Yalong River in China. The project consists of a 240 m high arch dam, two tunnel spillways, an overflow spillway, mid- and low-level...

Dam Rehabilitation and Fish Lift Design at the Pejepscot Hydroelectric Project
The rehabilitation work on the existing rockfilled timber crib dam comprised an assessment of the existing dam stability; analysis of the existing hydraulic conditions to establish the...

 

 

 

 

Return to search