A Comparison of Two Reservoir Projects and Associated Fisheries Impacts
The evaluation of environmental impacts is a critical component of reservoir project development. Impacts to fisheries are especially significant because of the extensive alteration to...
Hueco Bolson Recharge Demonstration Project
The Hueco Bolson Recharge Project in El Paso, Texas, is a unique recharge system, being a full-scale program in operation for 5 years in which municipal sewage is treated to potable quality...
Conjunctive Management of the Edwards Aquifer and Connected Surface Streams in South Central Texas
The Edwards Aquifer is a long, narrow conduit through which water moves underground across parts of South Central Texas. Increased use of water from the Edwards Aquifer has been substantial...
Managing an Interruptible Water Supply
The Lower Colorado River Authority has developed a plan for the management of an interruptible water supply for demands which do not require a firm commitment of specific amounts of water....
Corps of Engineers Drought Contingency Plans in Texas
The Corps of Engineers, Fort Worth District, is currently preparing Drought Contingency Plans (DCP) for the river basins and its projects. These plans will be incorporated into the master...
Benefits from Floodplain Management Activities in Relation to Operating South Holston Dam
Floodplain management activities have primarily been directed toward avoiding floodplain siting where practical; where siting is unavoidable, elevating structures, facilities, or equipment...
Review of the Design, Construction, and Operation of the Lake Carolyn Flood Control Pump Station
A review of the design, construction, and initial operation of the Lake Carolyn Flood Control Pump Station in Irving, Texas is presented. Staged water resource development design concepts...
Government Cooperation in Water Resources Planning and Management
The California State Legislators have shown real concern in trying to do something about the clearly identified water shortage. Many bills and funding programs have been proposed to encourage...
Streamflow Prediction and Allocation Model in Texas
The State of Texas' Water Rights Adjudication Act of 1967 provided for the creation of regional watermasters to divide the water of state streams in accordance with the adjudicated...
Water for Texans?Using the Water Development Fund
This paper is presented to provide information on the Texas Water Development Fund. The Fund is available as a source that can provide financial assistance to political subdivisions of...
The Coming Drought: Are You Ready?
Drought planning is necessary for the orderly development of a water supply system. Long range planning, risk analysis, multi-discipline cooperation, and public awareness are critical...
Drought Indication and Response
A study of rainfall and reservoir level data was conducted on the water supply system of South Central Connecticut to investigate the possibility of developing reliable, easy to use drought...
Transferable Rations for Drought Management?
This paper examines the concept of transferable water rations from an economic perspective. Transferable water rations may improve efficiency in the distribution of water by allowing customers...
Analysis of Groundwater Quality: A Database Application for the Nassau County, NY, Water Management Plan
Nassau County, Long Island, New York is presently developing a Comprehensive Water Management Plan. To determine the extent and trends in nitrate contamination of the groundwater, a preliminary...
Human Error: A Major Cause of Spills
Accidental spills and releases of toxic and hazardous releases is a much greater problem than realized. While data reporting systems do noe adequately account for human error as a causal...
Application of Risk Management and Value Engineering Techniques to Evaluation of Water Resources Projects with Special Emphasis on Geological Hazards
The purpose of this paper is to provide: 1) a perspective for identifying and evaluating in comparable terms all hazards at a site; and 2) a means for intelligent decision-making based...
Key Environmental Development Issues
Environmental statutes dealing with the control of pollutants generally regulate precriptively, establishing both technical standards, relating to discharges and their effect on the environment,...
The Use of the IWR-Main System as a Planning Tool in Phoenix, Arizona
The IWR-MAIN water demand forecasting model is used extensively as a long-range planning tool by the Phoenix Water and Wastewater Department. Its specific applications include: conservation...
The Center for Advanced Decision Support for Water and Environmental Systems
In July of 1988, the US Bureau of Reclamation awarded the University of Colorado a 4 year, 4 million dollar Cooperative Agreement for the development of a Center of Excellence in the Application...
Buried Treasure
Kelly describes landfill mining feasibility studies at two New England communities. Recently, due to rising landfill closure costs, a concept of landfill mining has been tested and shown...
Return to search