Evaluating and Controlling the Characteristics of the Nuclear Waste in the FWMS Using Waste Stream Analysis Model
The Waste Stream Analysis (WSA) Model is used by the Department of Energy to model the time and location dependent properties of the nuclear waste stream in the Federal Waste Managements...
A Systems Engineering Cost Analysis Capability for Use in Assessing Nuclear Waste Management System Cost Performance
The System Engineering Cost Analysis (SECA) capability has been developed by the System Integration Branch of the U.S. Department of Energy's Office of Civilian Radioactive...
The Coordination of System Representation and Operating Assumptions for System Studies in SIMS
Two projects at the Pacific Northwest Laboratory (PNL) have been devoted to development of the capability to provide descriptive details of the Federal Waste Management System (FWMS) and...
High Level Waste Management at Sellafield
Reprocessing of irradiated nuclear fuel has been carried out at Sellafield since 1952, when reprocessing of fuel from the original UK air-cooled reactors began. In 1964 a second reprocessing...
Influence of High Burn Up Nuclear Fuel and MOX on the High Level Reprocessing Waste Management
This paper compares characteristics of high level waste issued from the reprocessing of high burn up fuel (HTC) and mixed oxide (U-Pu)O2 fuel (MOX)...
Preliminary Conceptual Design Description of the Proposed DOE Store-Only Monitored Retrievable Storage (MRS) Facility
The Nuclear Waste Policy Act (NWPA) of 1982 required DOE to examine the options for the provision of long term spent fuel storage in monitored retrievable storage (MRS) facilities. Specifically,...
Fabrication and Closure Development of Nuclear Waste Containers for Storage at the Yucca Mountain, Nevada Repository
U.S. Congress and the President have determined that the Yucca Mountain site in Nevada is to be characterized to determine its suitability for construction of the first U.S. high-level...
Case System and Ancillary Equipment Maintenance
Per-shipment activities, incidental maintenance, repair, and routine maintenance for Federal Waste Management System (FWMS) casks and ancillary equipment and responsibility for those activities...
Requirements and Concept for an On-Orbit Construction Facility for Phase 1 Space Station Freedom
Future NASA plans for exploring the solar system and programs such as the Large Deployable Reflector and Pathfinder require in-space construction for their success. The technologies required...
A Space Station Trash Recovery and Recycling System
The quantity of trash produced on the Space Station during its lifetime will be substantial and will include useful waste materials. Given the high cost of transportation to orbit, it...
Site Constraints for a Lunar Base
A rigorous site plan is a prerequisite for quantitative analyses of lunar base operations. The development of such a site plan, done for a detailed lunar base study (RLSO, 89), is described...
Lunar Base Elements Designed for Robotic Operations
Equipment concepts developed for a study of robotic lunar surface operations are presented. The concepts were evolved together with a consistent robotic buildup and operations scenario;...
Manifesting for a Lunar Robotic, Oxygen-Producing Base
Using robotic systems and human supervisory control, a lunar base reasonably be established to achieve full production within five years. Intermittent human presence works in coordination...
Biosphere II: Closed Ecological Systems Engineering
This paper provides a general description of the Biosphere II project - a 3.15 acre materially closed ecological system containing tropical rainforest, savannah, marsh, marine, desert,...
Fluid Behavior Considerations for Waste Management in Low-Gravity Environments
Design of waste recycling systems for spacecraft requires a knowledge of fluid behavior in microgravity. As gravity is reduced, phenomena usually ignored in the One-G environment of earth...
Commercial Launch Facility Economic factors
Launch facility construction, maintenance and modification costs remain a largely invisible part of the cost of putting mass into orbit. The government can lease launch facilities to commercial...
Considerations for the Development of a Commercial Spaceport
Several states and countries are currently reviewing the feasibility of developing a commercial spaceport in their homeland. United Engineers & Constructors Inc. completed an extensive...
Columbus Generic Element Management Concept
The concept for largely autonomous onboard management of the ESA Columbus project elements relies on the automation of operational procedures. Reconfigurable items are commanded in sequence...
Normal Accidents and Logistics in Space Operations
Unpredictable systemic accidents, normal accidents, will occur in highly-complex large-scale space systems. To mitigate the catastrophic consequences of normal accidents, containment engineering...
Challenges and Opportunities in the '90s and Beyond?A U.S. Army Corps of Engineer's Perspective
In the foreseeable future, water resources expenditures will probably be dominated by environmental/water quality concerns. Strong focus is coming to bear on the state of repair, rehabilitation...