Construction of Performance Contours on the Storage-Yield Plane of a Within-Year Reservoir System
The reservoir storage-reliability-yield (S-R-Y) relationships developed in the past have considered only the probability of failure to meet the target requirements, but not the likely...

Protection against Flooding: A New Delta Plan in the Netherlands
The Netherlands are situated on the delta of three of Europe's main rivers: the Rhine, the Meuse, and the Scheldt. As a result, the country has been able to develop into an important industrial...

Controlling the Impacts of Development on Storm Water Quality through Proper Site Planning and Design
Land development and construction activities can significantly alter drainage patterns, increase runoff peak flow and volume, and contribute pollutants to storm water runoff. Federal and...

Use of Geomorphic Data for Assessing Stream Stability at Bridge Structures
The authors recently completed a statewide bridge scour evaluation for the Nevada Department of Transportation, which included evaluation of the geomorphic processes of bank erosion and...

Use of the Metric System in Water Resources
ASCE has advocated use of the metric system since 1876, and the Board of Direction's policy statement specifically urges use of SI in all civil engineering activities. In...

Resettlement of the Three Gorges Project in China
The Three Gorges Project (TGP), the biggest one in China, is now formally under construction, whose resettlement attracts world-wide attention. Thus introduced in this paper are resettlement...

Privatization and Water Supply/Treatment Projects
Privatization is often mentioned as a way to get much needed, but difficult to finance infrastructure projects delivered for both developed and developing countries. However, the suitability...

Riprap and Concrete Armor to Prevent Pier Scour
Local scour is not a product of recent times or modern building practices. The annals of the Institute of Civil Engineers, in London, contain references throughout the 1800s and early...

The Costs and Benefits of Dam Removal on the Elwha River
The Elwha River is located on the Olympic Peninsula in the State of Washington. In the early 1900s two hydroelectric dams were built on the Elwha River. Construction of Glines Canyon and...

Equity Measures for Selecting Sustainable Projects
Once implemented, a project may result in social, ecological, and economic impacts on both spatially and temporally distributed groups. Sustainable project selection requires that distributional...

Tensioned Fabric Structures
A Practical Introduction
The objective of this publication is to provide basic information about the nature and characteristics of tensioned fabric structures. Its target audience includes architects, engineers,...

Building an International Community of Structural Engineers
This proceedings, composed of two volumes, contains the papers presented at the American Society of Civil Engineers (ASCE) Fourteenth Structures Congress held in Chicago, Illinois, USA,...

Building Code Requirements for Masonry Structures (ACI 530-95/ ASCE 5-95/TMS 402-95); Specification for Masonry Structures (ACI 530.1-95/ ASCE 6-95/TMS 602-95); Commentary on Building Code Requirements for Masonry Structures (ACI 530-95/ ASCE 5-95/TMS 402-95); Commentary on Specification for Masonry Structures (ACI 530.1-95/ ASCE 6-95/TMS 602-95)
Copublished with American Concrete Institute (ACI) and The Masonry Society (TMS) Building Code Requirement for Masonry Structures,...

Sticking with the Web
After a slow start, engineers are rapidly claiming their territory on the World Wide Web. Here's a look at what they're doing and what they hope to gain�along...

Real-Time Construction Staking
Surveying has changed from a profession in which one learned skills on the job and could even become licensed without a degree. Now firms are turning to high tech equipment using geographic...

Success or Failure: A Tale of Two Projects
Twenty city blocks and a ten year period separated two projects of similar purposes, but with completely different endings. The first one, the Delancey Street Project, took place in 1984...

Robotics for Challenging Environments
This proceedings, Robotics for Challenging Environments, consists of papers presented at the Specialty Conference held in Albuquerque, New...

Decision Support
A number of factors have combined to make a computer-based decision support system (DSS) for power system operations attractive to Great Lakes Power Limited (GLP), a private utility that...

Storm-Water Treatment Goes Underground
The field of storm-water management continues to evolve as practitioners gain more experience and knowledge from the successes and failures of the past. While we once treated every site...

Scour Power
New prediction methods consistently calculate scour around bridge piers allowing engineers to better tailor pier design in rock and consolidated material. The leading cause of bridge failure...

 

 

 

 

Return to search