Ground Water Recharge in Central and West Coast Basins
The agencies responsible for the Central and West Coast Basins of Los Angeles County, California have managed their ground water supplies by the artificial recharge of reclaimed and imported...

Plume Management for Groundwater Remediation
Site-specific data for four sites were compiled to evaluate the effectiveness of pumping and treating contaminated groundwater and recharging the treated groundwater to the surficial aquifer....

Effect on Soil and Groundwater Due to Long-Term Land Treatment
A comprehensive assessment of the environmental impact of a full-scale, operating overland flow (OLF) land treatment system was made of the Campbell Soup, Inc. OLF system in Paris, Texas....

The Greening of Corporate America
Since the decade of the 80's has seen both the most stringent environment regulations as well as the most destructive environmental incidents in our history, most American...

Implementation of Agricultural Reuse in Florida
In mid 1986, the city of Sarasota was faced with the problem of removing a discharge of secondary treated wastewater from Sarasota Bay. The city embarked on a comprehensive evaluation...

High Level Radioactive Waste Management 1991
The proceedings of the second annual international conference on High Level Radioactive Waste Management, held on April 28 - May 3, 1991, Las Vegas, Nevada, provides information on the...

Project Peer Review Guidelines
Project Peer Review Guidelines, a joint effort of the American Consulting Engineers Council (ACEC) and the American Society of Civil Engineers...

Composting: Computing the Right Recipe
A pinch of this and a pinch of that is an adequate instruction for most good cooks. But for composting, facility managers need a recipe that specifies the right ingredients and exact amount,...

Connecting With DOTs
Want to bid on projects from state departments of transportation? First make sure your firm can translate computer-assisted drafting (CAD) drawings into different computer file formats....

Unit Pricing and Unbalanced Bids
Unit price contracts were meant to provide a simple and equitable way to pay contractors. However, to offset the uncertainties inherent in construction, contractors unbalance bid items....

Setting Standards in San Diego
Most engineering firms have developed specifications and standards that become the bible for project-related design issues�and no two firms are the same. On complex, large-scale projects...

LRFD: Still Waiting
Introduced in 1986, load and resistance factor design (LRFD), has a way to go before it becomes standard practice for steel design. LRFD-based design typically results in savings on gravity...

Portland's New Approach to Maintenance
The traditional if it ain't broke don't fix it approach to maintenance was not working for Portland, Oregon's two wastewater treatment plants. By...

Probing the Golden Gate
The Golden Gate Bridge has just come through the most detailed analysis ever attempted in its 53-year-old history. This analysis was squeezed into a desktop computer that calculates twice...

Pumped Storage Promise
With many utilities facing potential shortfalls in generating capacity, pumped storage hydro plants could be a key to meeting peak-period energy demand in the 1990s. Pumped storage plants...

Hydroproject Risk Analysis
Traditionally, feasibility studies performed for potential hydropower sites have included either no uncertainty or at best an ad hoc value associated with estimated benefits. However,...

Probabilistic Analysis of Modernization Options
Benefit-cost analysis is a standard procedure for reaching planning decisions. Cost overruns and benefit shortfalls are also common occurrences. One reason for the difficulty of predicting...

Economic Evaluation of Minimum Flow at Rockton
The Rockton Hydroelectric Project is a two-unit, 1,100 kW plant operated by South Beloit Water, Gas & Electric Company, a wholly owned subsidiary of Wisconsin Power & Light...

A Case for Modernizing the Funding and Repayment of Regional Water/Power Projects
Several regional water/power projects authorized by Congress remain unfunded and therefore uncompleted year after year. In this paper examples of such uncompleted projects are examined....

Improving the Assessment of Instream Flow Needs for Fish Populations
Instream flow requirements are one of the most frequent and most costly environmental issues that must be addressed in developing hydroelectric projects. Existing assessment methods for...

 

 

 

 

Return to search