Computer-Aided Negotiation of Water Resources Issues in California's Central Valley Project
The U.S. Bureau of Reclamation operates the Central Valley Project (CVP) in California. The CVP is a large system of streams, reservoirs and canals in California's Sacramento and San Joaquin...
Computerized Resource Planning for the Central Valley Project, California
The Central Valley Project (CVP) consists of nine reservoirs and ten powerplants owned and operated by the United States Government. On an average water year basis, the CVP, with a maximum...
Computer Simulation of CVP Power Production for Integration With PG&E's Power System
The Central Valley Project (CVP) has an installed hydropower capacity of over 1800 MW. The project facilities and its preference power customers lie dispersed within the service territory...
California's Adaptable Model for Operations Planning for the State Water Project
Operations of the California Aqueduct, a 440-mile-long feature of the State Water Project (SWP) consisting of canals, pipelines, reservoirs and hydroelectric plants, are planned using...
Stochastic Evaluation of Reservoir Operation Rules
The major water facilities in California encompass the State Water Project, operated by the State of California, and the Central Valley Project, owned and operated by the United States...
Probabilistic Dependable Hydro Capacity: Benefits of Synthetic Hydrology
This paper focuses on the benefits of using synthetic streamflows (the 'synthetic hydrology' approach) for determining a probabilistically defined dependable...
Kalman Filter in Real-Time Hydrologic Forecasting: A Tutorial
The Kalman filter provides an algorithm by which measured streamflow can be used to update the estimated hydrologic state of the watershed as determined from the application of a hydrologic...
The Alabama Rainfall-Runoff Model, ARRM
ARRM consists of a conceptual state-space model which is cast in a stochastic framework. It uses the W.H. Green and C.A. Ampt method for infiltration, exponential decay for interflow and...
Channel Routing for Improved Flood Control
Lake Wappapello, located on the St. Francis River in southeastern Missouri, is operated by the St. Louis District (SLD) Corps of Engineers for purposes of flood control and recreation....
Development, Calibration and Application of Runoff Forecasting Models for the Allegheny River Basin
The computer program HEC1F, developed by the Corps of Engineers' Hydrologic Engineering Center, performs runoff forecasting. The focus of this paper is on application of HEC1F...
Seasonal Streamflow Forecasts Based Upon Regression
Many western water-supply system operators employ forecasts of seasonal inflows for the snow-melt season to plan spring and summer operations. This study considers the simple statistical...
A Microcomputer Model for Integrated Analysis of Peaking Hydro in a Thermal System
An integrated approach to simulation of a hydro system called HYDROMOD has been developed and used to place a value on additional energy-limited peaking hydro capacity added to a major...
Role of Data Management in Water Control
The success of a system of software that must provide the water control user with current information, model analysis results, and forecasts of future behavior, is closely associated with...
Development of the Hydrodata CD-ROM Data Storage System
To store and retrieve data from two of the USGS WATSTORE databases - the daily and peak values files - and the Summary of the Day file from the National Climatic Data Center, the authors...
Optimal Operation of Complex Multireservoir Systems
The paper provides brief descriptions of papers presented in two workshop sections, and of discussions on modeling reservoir systems. The sections are on optimal operation of complex multireservoir...
Application of DDDP for Optimal Daily Operation of the Niagara Generating System
This paper describes the application of Discrete Differential Dynamic Programming (DDDP) to determine the optimal operation of Ontario Hydro's Niagara Generating System, on...
TVA Weekly Scheduling Model Application Experience
Development of TVA's Weekly Scheduling Model was completed in 1980. Eight years of experience covering a wide variety of applications has now been accumulated. Since the basic...
Stochastic Control of Hydropower Systems
A two-level stochastic control method is presented for the real-time operation of hydropower projects. The first level assumes fixed turbine discharges and utilizes probabilistic inflow...
Development of a Large Network Model to Evaluate the Yield of a Proposed Reservoir
The model simulates the operation of the Colorado River system upstream of Grand Junction, Colorado, and both the West Slope and the East Slope components of Colorado-Big Thompson system....
Optimal Operational Analysis of the Colorado-Big Thompson Project
The Northern Colorado Water Conservancy District is currently investigating the feasibility of constructing a major water storage project on the mainstem of the Poudre River for water...
Return to search