International and Educational Aspects of Watershed Management
International donor agencies involved in furnishing technical and economic assistance for increasing food and fiber production are focusing their attention towards rain-fed agricultural...

Snow Management at Ski Areas: Hydrologic Effects
Several types of snow management are practiced at downhill ski areas. Each of these activities has a variety of hydrologic consequences. The extent to which these management practices...

Closed Negotiations?Out with the Poker Players
The paper describes the closed negotiation process employed by one owner/client, the U. S. Army Corps of Engineers, in procuring firm, fixed price design service contracts. Although not...

Avoiding Lengthy and Costly Litigation by Negotiating Alternative Dispute Resolution Methods
A 'hot issue' in the construction industry today is the negative aspects perceived from wide arbitration use over the last 15 years. Although hearings usually...

Techniques of Negotiation
Three primary qualities are necessary for effective negotiation: knowledge, attitude, and skill. The author's firm has successfully used a negotiating team approach. This...

Embankment Seepage Control Design and Construction
For seepage control features of embankment dams, design criteria and construction practice is reviewed as it is reflected in the experience of the U. S. Army Corps of Engineers. The generally...

Seepage Control at Cochiti Dam, New Mexico
Significant design data, design assumptions and computations, and performance of the seepage control features provided at Cochiti Dam are summarized in this paper. The dam is a rolled...

Soldier Creek Dam Foundation Drainage
A possible mode of failure for Teton Dam, piping of erodible core material through unsealed foundation joints, was also concluded as being possible at Soldier Creek Dam, Utah. Evaluations...

Seepage in the Unsaturated Zone: A Review
This paper briefly reviews the procedures whereby the seepage rate, depth of penetration of nonreactive pollutants, and the depth of the wetting front can be calculated when the assumption...

Containment of Textile Waste Using a Geomembrane
A wastewater treatment plant for a textile mill incorporated two 2. 7 million gallon aeration ponds which had originally been lined with clay. The clay liner leaked and caused the formation...

Seepage Control for Embankment Dams USBR Practice
The current Bureau of Reclamation approach to seepage assessment, analysis, and design for embankment dams is described. The advantages and appropriate applications for the analysis programs...

Permanence of Chemically Grouted Sands
Test specimens were prepared with one of three uniformly graded sands of a fine gravel and injected with one of five silicate or two polyacrylic grouts. The polyacrylic grouts showed no...

Grout Penetrability
The ability of a grout to penetrate a formation is always a selection requirement for projects in which fracturing is undesirable. The major grout properties affecting penetrability are...

Embankment Foundation Densification by Compaction Grouting
Compaction grouting is an attractive alternate for in-place densification of liquefiable soils below existing structures. Compaction grouting application concepts and procedures are presented...

Some Aspects of Analysis and Prediction of Subsidence
A procedure based on the nonlinear finite element analysis was investigated for the prediction of subsidence caused by longwall mining. This paper presents a case study involving predictions...

Application of a Three-Dimensional Coupled Finite Element?Boundary Element Method
Three-dimensional conditions in underground construction occur at the face of a tunnel, at intersections of underground openings and around roughly equidimensional openings. As long as...

Fracture Mechanics Analysis of Massive Hydraulic Fracturing Containment
The hydraulic fracturing containment problem is the subject of the present investigation. Unlike previous studies, the interface crack geometry with the correct crack tip singularity was...

Prediction of Highway Construction Noise Levels
A model for the prediction of noise levels from highway construction operations has been developed under sponsorship of the Federal Highway Administration (FHWA). Noise sources are geometrically...

Noise and Air Blast from Construction Blasting
Noise generated by construction blasting differs from other construction noise because of its frequency content. The audible high frequency portion is accompanied by a non audible, lower...

Cost Assessment of Construction Noise Control
The results of a series of studies have provided noise control engineers with a method to estimate off-site construction noise levels and the cost of reducing these to acceptable levels....

 

 

 

 

Return to search