Working Breakwaters
Along the Virginia portion of the Chesapeake Bay, shoreline erosion has erased about 40,000 acres of land since 1850. Now a series of headland breakwater systems stems erosion up and down...
Waste to Energy? The Burning Question
For all their bad press, waste-to-energy plants actually provide a one-two environmental punch�they reduce garbage volume and provide alternative energy. But increasingly, state and local...
Riverbank Renewal
In Providence, project teams from the public and private sector worked side-by-side, rerouting two rivers and constructing a new corporate headquarters. What made the task more challenging...
Fly Ash for Hire
Each year, roughly 15 million tons of ash created by U.S. coal-fired powerplants is recycled. Most is used in concrete and other construction materials, such as structural fill, but utilities,...
Manhole Rehabilitation
Manholes are frequently the forgotten element in infrastructure renewal. When they aren't properly maintained they allow excess water into the sewer system, and structural...
Putting It Back
Before construction of the largest inclined turbines in the U.S., the Santa Ana River would carry storm flows out to sea, lost to the residents of water-poor Orange County. The area's...
World Marina '91
This proceedings,
Urban and Regional Conflict Resolution in Water Related Issues
This proceedings,
Detection of and Construction at the Soil/Rock Interface
This proceedings,
Seattle's Good Neighbor Policy
The West Point wastewater treatment plant in Seattle sits on a spit of land jutting into Puget Sound. Close by is Discovery Park, a haven for nature lovers, located on a bluff above the...
Microtunneling MARTA
Microtunneling technology was used to provide temporary support for two transit tunnels that were part of the extension of the Metropolitan Atlanta Rapid Transit Authority system. This...
Airport Construction: The Japanese Way
Japan is spending tens of billions of dollars on airport projects domestically and abroad through their aid programs. Examples of construction at the New Osaka Airport (Kansai), Narita/Tokyo,...
Politics and Engineering
The 1991 winner of the Daniel W. Mead Student essay contest states that there is a stereotype of engineers as those who derive recreational pleasure from seeing who can do most with a...
Analyzing Risk
Engineers designing major projects must often grapple with large areas of uncertainty�from estimating the seismic hazard to a nuclear powerplant to the potential effects of decades of...
Dam Foundation Grouting
Selling to Civil Engineers
A Multiple Market Opportunity
It covers the engineered construction market, the rehab market, and the environmental market....
Reliability of Large Technological Systems
Codes and regulations regarding large technological systems of growing complexity should take into account the increasingly sophisticated analysis tools that have been and are being developed...
Collision Risk Analysis Fixed Platform and Semisubmersible
This paper summarizes the North Sea experience pertaining to mooring line failures of conventional 8 and 12 anchor line systems. Mooring system calculations, experience and test results...
Probabilistic Risk Analysis of TLP Tether Fracture
A stochastic model for fatigue crack growth and final fracture of TLP tethers is formulated. Model updating through in-service inspection is included. The integrity of the cracked tether...
Largest and Characteristic Earthquakes in the U.S. East of the Rocky Mountains
A new statistical procedure is proposed for the estimation of maximum earthquake magnitude M in intraplate regions. Starting from a historical catalog of events and a seismotectonic classification...
Return to search