Structures Congress Honors Fazlur Khan
Speakers at a session of the 1983 ASCE Structures Congress paid tribute to the late Fazlur R. Kahn by describing his work in developing structural systems for highrise buildings that were...

Redecking with Precast Keeps Traffic Moving
The Woodrow Wilson Memorial Bridge in Washington, D.C. could not be closed to traffic while a new deck was constructed. The engineers designed a precast prestressed and post-tensioned...

Surveying's New Promise: Centimeters from Space
One centimeter accuracy at far less cost than surveying by traditional methods is promised by the Global Positioning System (GPS). Signals from NAVSTAR satellites are received by two or...

Curved Sewers: Yes or No?
A study of curved sewer use in Southern California examines sewer design and maintenance of curved versus straight sewers. A telephone survey of personnel in design and maintenance of...

Civil Engineering: At the Center of Technology for Tomorrow
Between now and the year 2000 civil engineers have the opportunity, perhaps more than any other profession, to help create the monuments of our civilization. This will involve projects...

Can Management Techniques Solve Pavement Woes?
Cities are increasingly turning to systematic procedures for allocating scare manpower and funds and measuring pavement repair and rehabilitation needs. Many cities have adopted pavement...

Experiences with Micros in Project Controls
The experience of one and one-half years of microcomputer use in project controls is related, with the intent of helping the system buyer anticipate useful applications, and suggesting...

Construction Estimating Decision Support Systems
A discussion of important considerations in the development of a computerized Decision Support System (DSS) is presented. These considerations include general hardware and software issues...

Trends in Small Computer Utilization
In an effort to determine the extent to which micro and minicomputers have been successfully implemented by construction contractors, the authors compiled a comprehensive questionnaire...

Automated Control and Robotics for Construction
This paper addresses the potential for automated process control and robotics for remote, large-scale field operations such as those on construction engineering projects. Combining selected...

Managing Overhead in Consulting Engineering Firms
One of the ways an engineering firm can maintain - or increase - profitability is through judicious management of overhead. Yet various industry studies suggest that the typical engineering...

Establishing a Computerized Accounting System in a Consulting Firm
If it has been determined that there is a need for a computer, the next step is to determine the software programming needs. The two distinct options in software are 'packaged'...

Managing Finances
Managing finances is becoming increasingly complex for the engineering manager. How the engineering manager assesses the impacts of an individual's attitude can have a pronounced...

Small Computers in Construction
These proceedings are the result of a symposium sponsored by the Task Committee on the Application of Small Computers in Construction of the Construction Division of ASCE. Nine papers...

Seismic Design for Sacramento Light Rail Transit System
The Sacramento Light Rail Transit Project is an 18. 5 mile system which provides the trunk line service for an integrated Bus/LRT public transportation system. Seismic design utilized...

Seismic Design of Underground Structures Southern California Metro Rail Project
The effect of earthquakes on underground structures is the imposition of an arbitrary deformation which cannot be changed by strengthening the structure. The structural design goal is...

Seismic Risk and Decision Analysis of Lifeline Systems
This paper provides general guidelines for performing lifeline seismic risk and decision analyses. Relevant input models are introduced as they support the performance of component and...

Retrofitting Lifeline Facilities: The Japanese Approach
A brief history of the prediction of a major earthquake in the Tokai Area of Japan is reviewed. Planning and mitigation incorporating all levels of government and the private sector is...

Performance of Water and Sewer Lifelines in the May 2, 1983 Coalinga, California Earthquake
Water supply and filtration systems for the City of Coalinga suffered little damage. The water transmission system suffered five breaks. The urban distribution system was disrupted, but...

An Overview of Earthquake Design Requirements at Pacific Bell
Seismic design considerations for the telephone system including outside plant and telephone equipment are discussed with emphasis placed on the requirements incorporated in the design...

 

 

 

 

Return to search