Altering Federal CVP Power Operations to Accommodate Fisheries' Survival on the Sacramento River
Balancing the needs of the river users, water and power users, and the fishery needs is a formidable task requiring sacrifices by all the users particularly during this time of drought...
Evaluation of Alternatives for Providing Minimum Flows Below TVA's South Holston Dam
TVA is in the initial phases of a project to provide minimum flows in the South Fork Holston River below South Holston Dam. The purposes of the minimum flows at South Holston are to enhance...
Twin Falls Mitigation Plan: Long Term Monitoring of Fish Populations
A fishery monitoring and enhancement plan has been worked out for the Twin Falls Hydroelectric Project which diverts water from a one mile reach of the South Fork Snoqualmie River in Washington...
Instream Flow Needs Below Peaking Hydroelectric Projects
A method has been developed to assist in the determination of instream flow needs below hydroelectric projects operated in a peaking mode. Peaking hydroelectric projects significantly...
Pumped Storage, the Environment and Mitigation
The privately financed 1,000 MW Rocky Point Pumped Storage Project located in central Colorado, USA, will be one of the world's highest head, 2,350 feet (716 m), reversible...
Harvest Facility Protects and Improves Fishery
By constructing a trap and transfer/harvest facility to control anadromous fish migration, the trout fishery on the Boardman River was protected and the salmon fishery was improved. The...
Case Study: Central Oregon Siphon Power Project Mitigating Local Concerns
In the early 1980's, 18 hydroelectric projects were proposed for development on the Deschutes River system in Central Oregon. Strong local opposition was a major factor in...
Review of Mitigation Methods for Fish Passage, Instream Flows, and Water Quality
Current environmental mitigation practices at nonfederal hydropower projects were analyzed. Information was obtained from project operators on dissolved oxygen (DO) mitigation, instream...
Factors Affecting Dissolved Oxygen in Hydropower Reservoirs
Dissolved oxygen (DO) is becoming a significant issue for hydropower projects. This paper identifies some key factors that can help hydropower operators better understand the nature of...
Distribution and Grain Sizes of Deposited Reservoir Sediments, Seventy Years after Dam Construction
The Elwha and Glines Canyon Hydroelectric Projects are located on the Elwha River in the northwest portion of the Olympic Peninsula in Washington State. The Elwha Dam was completed in...
Cooperation and the Endangered Species Act
Passage of the Endangered Species Act (ESA) in 1973 set the stage for some of the nations most polemic environmental battles. One of these is in the Colorado River Basin which is home...
Balancing Power Production with Natural Resource Benefits: Can You Trade Apples for Oranges?
Recent legislation affecting the licensing of hydropower projects requires that equal consideration be given to power and nonpower resource values. As is the case for past attempts to...
Relative Survival of Juvenile Chinook Salmon Through Bonneville Dam on the Columbia River
Preliminary results of a multiple year study indicate that juvenile chinook salmon passing through the juvenile bypass system at Bonneville Dam second powerhouse during the summer have...
Effects of Hydroelectric Turbine Passage on Fish Early Life Stages
Turbine-passage mortality has been studied extensively for juveniles and adults of migratory fish species, but few studies have directly quantified mortality of fish eggs and larvae. An...
Fish Entrainment and Mortality at the French Landing Hydroelectric Powerhouse
This case study explains the fish mortality study performed and results obtained at an existing hydroelectric powerhouse in Michigan. Undertaken in 1989 and 1990, this study provides data...
Fish Entrainment and Relicensing: Truths and Consequences
The states of Michigan, Wisconsin, and the U.S. Fish and Wildlife Service have issued guidelines that presuppose entrainment/turbine-induced mortality at most hydroelectric projects are...
Design of Extended Length Submerged Traveling Screen and Submerged Bar Screen Fish Guidance Equipment
The hydropower projects on the Snake and lower Columbia Rivers in the Pacific Northwest are unique because these rivers are also the spawning grounds for migratory salmon. The salmon swim...
Fish Protection at Water Intakes Using a New Signal Development Process and Sound System
American Electric Power Company, Inc., is exploring the feasibility of using a patented signal development process and sound system to guide aquatic animals with underwater sound. Sounds...
Atlantic Salmon Smolt Movement and Behavior at Vernon Hydroelectric Station
Behavior of emigrating Atlantic salmon smolts (Salmo salar) was studied at New England Power Company's (NEP) Vernon Hydroelectric Station located on the Connecticut River,...
Where's the Competition?: The Real Threats to Project Relicensing
The real potential competition in relicensing hydroelectric facilities is for use of the water and land resources currently dedicated to hydro power production. Relicensing applicants...