Management of Comments on DOE's Site Characterization Plan (SCP) and Integration with the Planned Geotechnical Program
The U.S. Department of Energy (DOE) has committed to respond to comments on the SCP throughout the site characterization process. As of January 1990 DOE has received 4,574 comments on...

Looking Out for the Ratepayer
The national high level nuclear waste management program has reached a crisis. The Department of Energy is ready to proceed with underground testing, but they are prevented from doing...

Strontium Isotopes in Carbonate Deposits at Crater Flat, Nevada
Strontium isotope studies of carbonates from soils, veins, eolian dust and Paleozoic basement sampled near Crater Flat, southwest of Yucca Mountain, provide evidence for the origins of...

An Evaluation of Evidence Pertaining to the Origin of Vein Deposits Exposed in Trench 14, Nevada Test Site, Nevada
Large vein-like deposits of calcite and opaline silica that infill the Bow Ridge fault are exposed by Trench 14 at the Nevada Test Site. The origin of the deposits has been the center...

Archaeological Program for the Yucca Mountain Site
Archaeological surveys, limited surface collections and selected test excavations in the Yucca Mountain Project Area have revealed four distinct aboriginal hunting and gathering adaptive...

Management and Research of Desert Tortoises for the Yucca Mountain Project
A program has been developed for the Yucca Mountain Project (YMP) to manage and study the desert tortoise (Gopherus agassizi), a threatened species that occurs at low densities at Yucca...

Assessing Impacts on Biological Resources from Site Characterization Activities of the Yucca Mountain Project
An integrated impact assessment program was developed to monitor the possible effects of Site Characterization Activities (SCA) on the biological resources of the Yucca Mountain area....

Preliminary Assessment of the Impact of Conceptual Model Uncertainty on Site Performance
Performance assessment modeling for high-level radioactive waste (HLW) disposal incorporates three different types of uncertainty. These include data and parameter uncertainty, modeling...

Scenario Evolution: Interaction Between Event Tree Construction and Numerical Analyses
Construction of well-posed scenarios for the range of conditions possible at any proposed repository site is a critical first step to assessing total system performance. Event tree construction...

Site and Facility Waste Transportation Services Planning Documents
The Office of Civilian Radioactive Waste Management (OCRWM) will eventually ship Purchasers' (10 CFR 961.3) spent nuclear fuel from approximately 122 commercial nuclear facilities....

Circuitous Routings: Integration of Public Acceptability with Technical and Economic Feasibility
Public acceptance of agency plans for shipment of radioactive wastes to disposal facilities may be critical to efforts to site geologic repositories. Local and state participation in route...

Payments-Equal-to-Taxes (PETT): An Interpretation of Sections 116(c) (3) and 118(b) (4) of The Nuclear Waste Policy Act of 1982, as Amended
The opinions expressed in this paper are those of the authors and not necessarily those of either the U.S. Department of Energy or of Deloitte & Touche. The Payments-Equal-To-Taxes...

A First Look at Roadheader Construction and Estimating Techniques for Site Characterization at Yucca Mountain, Nevada
The Yucca Mountain site characterization program will be based on mechanical excavation techniques for the mined repository construction and development. Tunnel Boring Machines (TBM's),...

A High-Level Waste Repository Performance Assessment Methodology
This project was sponsored by the Electric Power Research Institute to examine methods that coordinate information from various disciplines to present an integrated perspective on the...

Radioactive Waste: Finding a Safe Place
The Nuclear Waste Policy Act of 1981 and its amendments mandate that the U.S. Department of Energy find a repository for the nation's high-level radioactive wastes, characterize...

Getting the Lead Out
When officials from Omaha, Neb. announced an ambitious plan to revitalize an abandoned stretch of land along the Missouri River, the land itself presented one of the biggest problems....

Closing Hazardous Landfills
Designing and constructing covers for uncontrolled hazardous-waste landfills can pose some special problems�such as differential settlements as great as 50% of landfill thickness. Under...

Fear of Trying
Conventional methods for cleaning up hazardous-waste sites are expensive, subject to increasing restrictions, and don't work that well for certain types of waste. Innovative...

Siting of a Reclaimed Water Reservoir
The City of Santa Rosa (City), California, retained Woodward-Clyde Consultants to identify, evaluate, screen and rank potential sites for construction of a dam and reservoir to store reclaimed...

Pilot Drywell Study Pierce County, Washington
Subsurface disposal of stormwater runoff is widely utilized in areas with permeable or porous soils, including the Clover/Chambers Creek (CCC) Basin in central Pierce County, Washington....

 

 

 

 