Water In, Water Out
Moving water into and out of the Eastside Reservoir, which will be the largest body of freshwater in southern California, requires some of the largest pumping and water conveyance systems...

Sinking a Sewer Line
The design and construction of a sanitary sewer siphon using high density polyethylene (HDPE) pipe in San Juan, Puerto Rico, provided Black & Veatch with a challenging opportunity...

Safeguarding Los Alamos
A forest fire that burned 48,000 ac (19,500 ha) around the Los Alamos National Laboratory, in New Mexico, in May 2000, created another problem for one of the nation's most...

Judgment and Innovation
The Heritage and Future of the Geotechnical Engineering Profession
This book contains six papers of timeless value from some of the most experienced leaders of the geotechnical engineering profession. The papers reflect over 250 years of collective geotechnical...

Trenchless Transformation
The Framingham Extension Sewer (FES) was constructed of reinforced-concrete pipe in the mid-1950s as part of the wastewater collection system for the greater Boston area. Age and hydrogen...

Beach Town Cleanup
The Avila Beach remediation project in California required the demolition of numerous structures and part of the beach in order to remove more than 200,000 cu yd (153,000 m�) of contaminated...

Sprinkler Irrigation
In sprinkler irrigation, water is applied to the soil using a pressurized piping system with nozzles, jets, or perforated pipe that sprays the water into the air. These sprinkler devices...

Pipe Up
The East Bay Municipal Utility District (EBMUD) provides potable water for approximately 1.2 million people in San Francisco's East Bay area and is constructing seismic upgrades...

Microtunneling under Honolulu
Highly congested urban utility corridors present some of the most difficult conditions for construction of new underground pipelines, especially when subsurface conditions are also very...

Into the Fourth Dimension
A team of contractors designed a pharmaceutical plant entirely in 3-D CAD, then linked the renderings to a cost program and scheduling software, adding a fourth dimension�time�to the process....

Guidelines for the Seismic Evaluation and Upgrade of Water Transmission Facilities
Prepared by the Technical Council on Lifeline Earthquake Engineering of ASCE This TCLEE Monograph provides guidelines for the seismic evaluation and...

Simplification of Detailed Models of Water Distribution Systems Obtained from GIS Systems
For a long time simplified models have been used to simulate the behaviour of large water distribution networks. Often, simplification has been carried out by removing small diameter pipes...

Friction Factor Choice in Hydraulic Simulation Models: Does It Matter?
(no paper) To model water distribution systems using computer hydraulic simulation, a user is required to select a form of head loss-flow relationship for each pipe in the network. The...

Under Pressure
The Arrowhead East and West contracts for the Inland Feeder water conveyance system being built in California consist of 51,500 ft (15,700 m) of tunnels that cross the San Andreas Fault...

Main Line Mending
Both the Washington Suburban Sanitary Commission (WSSC), of Laurel, Maryland, and the Providence Water Supply Board, of Rhode Island, are conducting massive, multimillion-dollar rehabilitation...

Relining a Relic
By the mid-1980s most of the Boston Low Service water supply network had been in operation for more than 100 years�with little regular maintenance. Many of the system's air...

Conquering the Cold
Three projects�a water treatment plant, an airport, and a hydroelectric plant�illustrate how practicing engineering in Alaska differs from working in the contiguous 48 states. Permafrost,...

Conquering the Mountain
Interstate 26 will be the largest and most expensive highway project ever undertaken in North Carolina. When completed in 2002, I-26 will provide safe and efficient interstate passage...

Probing Pipelines (available only in Geoenvironmental Special Issue)
Inspecting underground pipelines has become easier, more effective and less intrusive through use of sonar, radar, lasers and seismic and acoustic testing. To replace simple visual inspection,...

Putting Wetlands to Work
Wetlands, whether natural or engineered, have enormous potential to clean up wastewater, but in the past, the public called on civil engineers to drain wetlands en masse as a public benefit....

 

 

 

 