On-Orbit Assembly and Refurbishment of Lunar Transfer Vehicles
Initial flights of space-based manned lunar transfer vehicles (LTV) will require some on-orbit assembly and checkout due to mass and volume limitations of the Earth-to-orbit (ETO) launcher....

An Economic Evaluation of the Thunder Bay Air Terminal Development Strategies
The Air Terminal Building (ATB) at the airport in Thunder Bay, Ontario, Canada is currently being utilized at approximately 140% of its design capacity. In response, three alternative...

New Seoul Metropolitan Airport
The New Seoul Metropolitan Airport (NSMA), to be built on a man-made island near Seoul, Korea, will have access to the city by bridge, rail, and dedicated freeway. When completed, NSMA...

Impact of the New Denver Airport on the Air Traffic Control System
Building the new Denver Airport has two major impacts on air traffic control: first, it requires redesigning the airspace surrounding the Denver area; and second, it requires moving to...

Sydney Airport International Terminal Development
The existing International Terminal at Sydney (Kingsford Smith) Airport-KSA-is overcrowded and providing a low level of service. Planning for an expanded facility catering for KSA needs...

New Hong Kong International Airport
The airport at Kai Tak has served as a viable commercial operation since the lat 1930s and has played a pivotal role in the territory's development. The fact that Kai Tak has a finite...

Container Terminal Planning: 2001
This paper highlights the technical, yet practical planning process and operations research methodologies used by the country's largest containership company to guide 21st Century container...

A Comprehensive Approach to Container Terminal Planning: Striking a Balance
This paper uses the Port of Seattle's recently released Container Terminal Development Plan to present a case-study of a master planning process for continued development of container...

New Cruise Terminal for San Francisco
A new international Cruise Terminal is being developed at Pier 30-32 in San Francisco, to replace present inadequate facilities at Pier 35. The Cruise Terminal will be developed as part...

On-Off Terminal Ship-to-Rail Transfer
The intermodal situation of U.S. ports is still evolving, and port planners will be facing difficult decisions regarding IM Configurations. This article was intended to assist 'perplexed'...

Planning, Design and Integration of a Computerized Terminal Operating System
NYK Line's new terminal at the Port of Los Angeles (photograph below) features innovative design and advanced terminal operating system integration....

Planning/Analysis of VPA's Norfolk North Terminal
The Virginia Port Authority (VPA) is developing a new marine container terminal on the northern portion of its land at Norfolk International Terminals (NIT). The terminal is to be designed...

Vacuum Alumina Unloader for Port of Everett
The Port of Everett is in the process of rebuilding and expanding its marine cargo facilities. Much of the Port's waterfront land and facilities were lost to the U.S. Navy Carrier Homeport...

Soil Contamination Issues at Port Marine Terminals
A preliminary survey of hydrocarbon contaminated soil and groundwater problems in U.S. west coast ports indicates that the problem occurs in most major port areas. Using the Port of Los...

Seismic Survey Considerations in the Planning and Design of Dredging Projects for Marine Terminal Facilities
This paper presents a case study of the value of high resolution seismic survey information when planning and designing a dredging project for a marine terminal facility. Advances in high...

A Removable Submarine Cover for Drydock No. 2 Modernization
In order to provide balanced overhaul capability and flexibility in the 1990's and beyond, the Portsmouth Naval Shipyard in Kittery Maine, a major U.S. Navy submarine and overhaul repair...

Underground Refrigeration Outlets
This paper discusses facilities for underground refrigeration at terminal at Port of Tacoma, to provide services to Evergreen line, the worlds largest container shipping company....

Crane Rebuilding vs. New Purchase
The dimensional and operational features of a container crane which are deemed desirable, if not necessary, in a modern port terminal are discussed and quantified. Some reasons why a crane...

Crane Raise with Zero Downtime
Massachusetts Fort Authority (MPA) was faced with a dilemma. Its Conley Terminal tenants needed higher cranes but could not relinquish the cranes for more than a few days at a time. No...

Evaluation of Proposed Port Facilities, Charleston Harbor, South Carolina
Often it is necessary for port facility designers to evaluate various alternative development plans for port facilities. These evaluations may include a ship navigability study or an evaluation...

 

 

 

 

Return to search