Getting Along: The Geotech and the CM
The opinions of geotechnical engineers are usually respected within a consulting firm, but when such a specialist gets out in the field, he or she is seen as merely part of the backup...

Computer Scheduling and Construction Specs
As recently as the early 1980s, employing computers in critical path method (CPM) scheduling was a formidable decision demanding considerable commitment of time and resources by management....

Lead is a Four-Letter Word
New regulations and strict enforcement make it difficult and expensive to remove lead-laden coatings from steel structures. Lead-based primers and paints are not considered hazardous as...

Local Water, Local Control
Governments throughout the world are trying to improve the performance of publicly-owned and operated irrigation districts by turning operation and management of the districts over to...

A Solid Waste Solution
Burgeoning growth and diminishing landfill capacity have been propelling Broward County, Fla. toward a solid-waste crisis. The county, located along Florida's southeastern...

Pioneer Highway
The 1993 Outstanding Civil Engineering Achievement Award goes to the $490 million I-70 Glenwood Canyon in Colorado. The final link in Interstate 70 from Baltimore, Md. to Cove Fort, Utah,...

Closing the Loop
The 5.1 mi Cooper River Bridge, the longest in South Carolina, completes the I 526 Mark Clark Expressway around Charleston. It is a two-way, four-lane structure with the capability of...

London Linkage
Although it measures just 1.8 km, the Limehouse Link tunnel in London is both a complex engineering project and a gateway to urban renewal. The link is a $350 million highway tunnel connecting...

California Water Issues?Bay-Delta Hearings?Impacts on State Water Project
The State Water Resources Control Board's impending Decision 1630 is described along with its potentially substantial impacts on California's water supplies. Department of Water Resources...

Issues in Balancing Environmental Costs and Benefits in Water Resources Planning
Water projects differ in their physical and economic characteristics and their environmental impacts. Many environmental impacts are addressed through project design and these associated...

Establishing a Drought Reserve Policy for the Monterey Peninsula Water Management District
The Monterey Peninsula Water Management District was created by the California Legislature in 1977 for the purpose of developing an integrated management program for all of the water resources...

Well Response in a Leaky Aquifer and Computational Interpretation of Pumping Tests
An analytic solution is derived describing flow in a horizontal confined leaky aquifer of infinite extent around a fully penetrating well of negligible storage capacity. The differences...

Concentration History During Pumping from a Leaky Aquifer with Stratified Initial Concentration
Analytical and numerical solutions are employed to examine the concentration history of a dissolved substance in water pumped from a leaky aquifer. Many aquifer systems are characterized...

An Overview of Methods to Delineate Capture Zones of Pumping Wells
Rainfall over the surface area of an unconfined aquifer, which contributes flow to a pumping well under Dupuit conditions, was estimated. Using a two-dimensional analytical model with...

Regulatory Constraints on Vegetation Control in Channels, A Case Study of the Santa Ynez River, Santa Barbara County, California
The Santa Barbara County Flood Control and Water Conservation District has encountered difficulties in obtaining permits from state and federal agencies for vegetation control activities...

Regulatory Obstacles to Emergency Response, A Case Study of the Paint Fire, June 1990, Santa Barbara, California
After the Paint Fire of 1990, the Santa Barbara County Flood Control and Water Conservation District took several measures to prevent damage due to mudslides and floods from the burned...

A Semi-Discrete Element Approach to the River Ice Breakup and Jamming Process
A semi-discrete element approach was developed to simulate the whole river ice breakup and jamming process. In this approach, ice mass is treated as discrete elements, and the movement...

Adaptive Control of Unavoidable Hazardous Releases
This paper presents a procedure for the adaptive control of hazardous releases of toxic substances. In particular, the control strategy is aimed at deliberate releases from man-made storage...

Mechanism of Air Entrainment in Spillway Aerators
The mechanism of air entrainment in the Nappe over spillway aerators was investigated. Turbulence was identified as the main agent for aeration. It was found that Nappe underpressure influences...

Simulation of Rapid Reservoir Drawdown for Flood Control, Cowlitz Falls Project
The Cowlitz Falls Dam is a run-of-river project, currently under construction on the Cowlitz River in Washington State, 23 Km downstream from the town of Randle. The requirements for reservoir...

 

 

 

 

Return to search