Digital Simulation of Wind Load Effects
The time domain solution of the equations of motion of structures subjected to a stochastic wind field is often obtained by a step-by-step integration approach. The loading is often described...

Comparison of Wind Cross-Spectral Data with Models
Existing analysis procedures for the prediction of long-span bridge response to wind have until recently neglected the horizontal-vertical cross-spectral components of the wind under the...

Non-Gaussian Vortex Induced Aeroelastic Vibrations under Gaussian Wind
The 'lock in' aeroelastic vibration phenomenon observed for random wind excitation is modeled in a way that allows the application of the Slepian model process tool to obtain an approximation...

Fatigue Life Variability and Reliability Analysis of a Wind Turbine Blade
Wind turbines must withstand harsh environments that induce many stress cycles into their components. A numerical analysis package is used to illustrate the sobering variability in predicted...

The Evolution of an Environmental Monitor
After more than 40 years of planning, litigation, design and construction, one of the nation's most controversial highway projects is finished. The completion earlier this...

Port of Portland's Berth 601 Floating Dock
The Port of Portland's facilities, being located on the Columbia and Willamette Rivers, are subjected to extreme water level fluctuations. Over the years, the Port has used floating docks...

A Removable Submarine Cover for Drydock No. 2 Modernization
In order to provide balanced overhaul capability and flexibility in the 1990's and beyond, the Portsmouth Naval Shipyard in Kittery Maine, a major U.S. Navy submarine and overhaul repair...

Barbers Point Harbor: A Unique Solution for Port Upgrade
A remote-controlled model of a C9 containership was used to evaluate the navigability of existing harbor and entrance channel conditions in a three-dimensional physical model of Barbers...

Experimental Investigation of Self-Tapping Fasteners for Attachment of Corrugated Cladding Panels to Pultruded Fiber-Reinforced Plastics Beams in Industrial Building Construction
This paper describes an experimental investigation of self-tapping fasteners for the attachment of corrugated fiber-reinforced plastics (FRP) cladding panels to pultruded FRP beams. Although...

The Crown and the Curtain Wall
Crowning the complex curtainwall of an 870 ft concrete tower with a 150 ft high crown of aluminum masts in concentric rings above the 60th floor required ingenuity and extraordinary cooperation...

A Face-Lift for Lincoln
The 45-year-old Lincoln Tunnel is undergoing a sweeping rehab�from its ceiling on down to its roadway. Each of the three tubes (in the world's only three-tube underwater vehicular...

Specifying the Offshore Environment
Hindcasting has become a generally accepted method of producing long time series of environmental events from which environmental design criteria can be developed. The need for reliable...

Spectral and Statistical Characteristics of Wind Waves Off Canary Islands
Wave climate around Canary Islands is studied by means of statistical and spectral techniques. Maximum Entropy Method is used for obtaining the spectral density function. Autocorrelation...

Response Statistics of Tension Leg Platforms Under Wind Loads
This paper presents the direct integration method and Kac-Siegert technique to solve the first four cumulants in the general quadratic systems, and proposes the splitting technique to...

Excavation and Support for the Urban Infrastructure
This proceedings, Excavation and Support for the Urban Infrastructure, contains papers which focus on various aspects of excavations and ground...

The Great Chicago Flood of 1992
In April of 1992, a breach in a freight tunnel caused the river that flows through Chicago to pour into city building basements, causing the city to shut down. Critical utility systems...

Tunnel Takes Cathodic Protection
Cathodic protection is nothing new for bridges and parking garages, but it has never been installed in a tunnel�until now. As part of a $15 million rehabilitation project, the method is...

The Caisson Solution
Detroit is expanding its wastewater treatment plant to drastically reduce combined sewer overflows. The expansion, however, is being done on an extremely congested 4 acre tract of land...

Mining for Building Expansion
Engineers adapted mining techniques to tunnel under a vibration sensitive manufacturing operation to create new working space below. IBM workers needed more working space at their Vermont...

Safety Factors, Loads, and Impact
The loads given in this chapter are intended for general guidance only (including wind, ice, stream flow, etc.). Maximum deflections and rotations may likewise vary with national codes....

 

 

 

 

Return to search