Closed Negotiations?Out with the Poker Players
The paper describes the closed negotiation process employed by one owner/client, the U. S. Army Corps of Engineers, in procuring firm, fixed price design service contracts. Although not...

Advantages of Standard Contract Forms
The standard forms produced by the Engineer's Joint Contract Documents Committee (EJCDC) offer many advantages to Engineers and others involved in the negotiation and preparation...

Techniques of Negotiation
Three primary qualities are necessary for effective negotiation: knowledge, attitude, and skill. The author's firm has successfully used a negotiating team approach. This...

Computer Applications in Grouting
The first use of computers during foundation grouting was tried by the Bureau of Reclamation on Ridgeway Dam in Colorado. It was very useful in monitoring real time down hole conditions...

Probability of Stability Design of Open Pit Slopes
Uncertainty and risk have always been associated with mining. This is evidenced in the common mining terminology of proven ore, probable ore, and possible ore. From a geotechnical standpoint,...

Prediction of Highway Construction Noise Levels
A model for the prediction of noise levels from highway construction operations has been developed under sponsorship of the Federal Highway Administration (FHWA). Noise sources are geometrically...

Lift Bridge looks Like Sculpture
A lift bridge built in 1926 over the U.S. Canal at Kaukauna, Wis. was replaced by a sleek new lift bridge whose sculptured shape encloses all the machinery within welded steel box sections....

Hundreds of Bridges�Thousands of Cracks
In the past 10 years hundreds of welded steel bridges, most of them relatively new, have suffered thousands of cracks due to secondary stresses, that is, the cracks are caused by deflections...

Load-Carrying Capacity and Remaining Life of First-Built Composite Girder Bridge in Japan
Kanzaki Bridge, Osaka, Japan, was the first steel-concrete composite bridge built in 1953 to carry the Osaka Prefectural Road over Kanzaki River. The bridge was removed in 1978 after 25...

Design and Testing of a 400 Ft Span Plate Girder Bridge
The paper describes design features and testing of the Madawaska River Bridge. The bridge is unique in being the longest span plate girder bridge in Ontario, having continuous spans of...

Composite Bridge Design in Germany
A span length between 40 m and 12 m has been regarded as optimal up to the mid-60's for a composite design to compete with prestressed concrete or steel alternatives. With...

Composite Steel Deck Bridge: An Experimental Study
Composite steel decks with steel fiber reinforced concrete (SFRC) were developed, aiming to improve the durability of the deck pavement and to increase the rigidity of the deck plate in...

Dynamic-Fatigue Response of Continuous Composite Bridges
The dynamic response of continuous composite bridges and the influence of fatigue loading at resonance frequency on the structural response are investigated. It is shown that cracking...

Application of Preflexed Composite Beams to Continuous Bridges
A preflexed beam is a type of concrete encased steel beam of which prestressing has been introduced in the lower flange concrete. Recently, the preflexed composite beams were applied to...

Recent Research on Composite Structures for Building and Bridge Applications
Continuing research has been carried out at Lehigh University on composite structural members, joints, and overall systems. This paper summarizes the results of research on four selected...

Seminar Summary and Research Needs
All the papers presented in the technical sessions of the seminar are summarized and, in some cases, commented upon. The needed research in composite and mixed construction is described....

Timber Bridge Decks
The portion of the nation's 500,000 bridge decks that are made of timber has been declining for years, as the old timber ones on secondary road bridges are rebuilt, in most...

High Strength Steel
A Wall Street Journal story in January 1984 described a number of bridges, buildings, automobiles, buses and other structures made of high-strength...

Checking Off CADD Priorities
Diving head on into new computer aided design and drafting (CADD) hardware and software without considering their effects on firm or university's operation is as bad as ignoring...

A Road to Recovery
Inspections of the Golden Gate Bridge revealed that the bridge had localized corrosion near its expansion joints, corrosion of its reinforcing steel, and was severely contaminated with...

 

 

 

 

Return to search