Ashton Hydroelectric Project Rehabilitation
This paper presents the project experience of rehabilitating the 70-year old Ashton power house and performing the dam design modifications to pass the increased probable maximum flood....
Dillon Hydroelectric Project Performance Versus Expectations
The Dillon Hydroelectric Project was commissioned in 1987. Design and construction are briefly described; plant availability is compared with design expectations; and maintenance costs...
The Twin Vortex Draft Tube Surge
Recent studies conducted at Colorado State University using a model of the 700-MW turbines at the U.S. Bureau of Reclamation's Grand Coulee Third Powerplant indicate that...
Deflector Plate Turbine Aeration?Case Studies
Water quality requirements have become a focal point in recent re-licensing of hydroelectric projects. The Federal Energy Regulatory Commission has significantly increased the relevance...
Performance Analysis of Multipath Acoustic Flowmeters Under Various Hydraulic Conditions
Multipath, crossed plane acoustic flowmeters are being increasingly used for hydroelectric turbine efficiency measurement both for acceptance testing and efficiency mapping of units in...
Hydropower Research: The University Perspective
University hydraulic laboratories have provided applied research services for the hydropower community for many years. It is the contention of this paper that only limited technology transfer...
Waterpower 91?Laboratory Investigation of Syphon Intakes
The Federal Department of Energy, Mines and Resources (Canada) has funded four separate investigations of syphon hydro technology. These study phases, which were carried out by Acres Hydraulic...
Development of an Eicher Screen at the Elwha Dam Hydroelectric Project
The Eicher Screen is a relatively new concept for screening juvenile fish out of hydroelectric turbine penstocks. The concept was developed by Mr. George Eicher and one was recently installed...
Fish Bypass System Mathematical Models
Mathematical models for fish diversion systems based on fish behavior in conjunction with diversion system structural and hydraulic properties are developed. Guidance efficiency is described...
Hydroacoustic Evaluation of Deep and Shallow Spill as a Bypass Mechanism for Downstream Migrating Salmon at Rock Island Dam on the Columbia River
Hydroacoustic data were collected on downstream migrating juvenile salmon (Oncorhynchus spp.) during the springs of 1983 and 1984, and summer 1990 at Rock Island Dam on the Columbia River...
Sediment Removal from Sand Hills Aqua Farms Using a Sediment Evacuation Pipeline System
Reservoir sedimentation continues to deplete the world's reservoirs of valuable storage capacity. Several reservoir sediment removal techniques have been successful in regaining...
Design Concepts for Vertical Kaplan Turbines
In this paper, some general aspects as well as selected design details of vertical Kaplan turbines are presented. The Monroe Street project which is under construction right now serves...
Rocky Mountain Pump-Turbines and Related Mechanical Equipment
The Rocky Mountain powerplant will have three reversible, single stage, vertical shaft pump-turbine units, each having a maximum output of 321 MW generating and a maximum pumping capacity...
On-Site Rehabilitation Capabilities for the Nineties
This paper will review recent technological advancements in on-site manufacturing and machining capabilities which have been developed for the proper installation of new hydro turbines....
An Overview of the Latest Developments in the Modernization, Upgrading and Rehabilitation of Existing Hydraulic Turbines
The growth experienced in the 1980's in the modernization of older hydro plants has fueled the development of new runner and wheelcase designs and modifications providing...
Weld Overlaying with a Cavitation-Resistant Alloy
The characteristics and applications of a cavitation-resistant alloy, Hydroloy HQ913, are described. The alloy as weld overlays applied on hydropower plant components by covered electrodes...
New Interior Lining for Welded and Riveted Penstocks
Pacific Gas and Electric Company (PG&E) has 73 hydroelectric power facilities installed throughout its distribution system. Each of these facilities has at least one penstock,...
Diagnostic Testing and Repair of Grand Rapids Generating Station's Unit Four
This paper is a case history that discusses diagnosis and correction of a variable pitch propeller type (Kaplan) hydraulic turbine problem. The turbine problem involved fatigue failures...
Pressure-Time Method Using Modern Practices
Over the past twenty years, Hydro-Quebec has modernized the pressure-time method of flow measurement, a method which is generally economical but sometimes difficult to apply. Starting...
Turbines and Pump Turbines for Ultra High Heads
The paper describes the turbine development in Norway as background for high head turbine technology and shows a typical Norwegian high head Francis as an example. High head reversible...
Return to search