Tying Back a Landslide
A slope covered with landslide debris is never the most desirable site on which to build, but sometimes it is the only one available. For the Forks of Butte hydroelectric power project,...

Manholes and Microtunneling
Contractors are for the Oakwood Beach Interceptor Sewer Project, on Staten Island, N.Y., were having difficulty. Glacial tills and a high water table made working 90 ft below the ground...

Put to the Test
In the construction industry, the concept of life-cycle cost applies not only to the infrastructure itself, but to the materials that go in to building that infrastructure. To improve...

In Too Deep
Urban excavation is fraught with risks and potential liability for engineers and contractors. Environmental issues (such as Superfund regulations and environmental impact statements),...

Settling Down Easy
In order to more fully participate in the international and Asian Pacific aviation network, it was decided to establish a highly efficient 24-hour a day operation at the New Kansai International...

Underground Research: Here and There
Geotechnical research in Europe, Japan and the U.S. were compared in a study funded by the National Science Foundation. Visits to research facilities and several surveys resulted in two...

Pressure Pipeline Design for Water and Wastewater
This committee report, Pressure Pipeline Design for Water and Wastewater, is a revision of the 1975 ASCE publication Pipeline...

Rethinking the Competitive Bid
Concern that the U.S. construction industry is losing its competitive edge is nothing new. Ironically, the problem is not so much rooted in foreign technical expertise as it is in our...

Decentralized Wastewater Management
With the discovery earlier this century that city squalor caused disease, we protected ourselves by piping raw wastes away. Later, when the discharge had transformed rivers into foul,...

Dome Over Orlando
The article describes Orlando's new City Hall, a 267,000 sq ft nine-story reinforced concrete tower, clad in granite-aggregate precast concrete panels and topped by a 120...

School Is In Session
Cost overruns, project delays and the city bureaucracy have given school construction a bad reputation throughout the U.S., particularly in urban centers. But as other construction markets...

Sending Steel Down the River
Completed last October 1990, the Roosevelt Lake Bridge is now the longest two-lane, single span, steel-arch bridge in North America, spanning 1,080 ft. Also, the longest steel arch bridge...

The Effect of Loading Rate on the Bending Strength of Alluvium Reinforced Ice
Traditional building materials are often less than ideal for construction in remote Arctic locations. Their mechanical properties may be degraded in extreme cold, and costs associated...

Sludge Dewatering in Freezing Beds
This paper summarizes the results of laboratory and pilot scale studies on the development of the sludge freezing bed. Laboratory studies indicated that a freezing bed could dewater up...

PS 5 Sewage Lagoon Embankment Stabilization
In 1981 an embankment containing a three-cell wastewater treatment lagoon was constructed adjacent to the northern edge of the Pump Station 5 gravel pad on the Trans Alaska Pipeline System....

Winter Sewer Construction in Campbell Lake
This paper discusses the winter construction for replacement of the Campbell Lake portion of the Campbell Creek C-5 Trunk (C-5 Trunk) located in Anchorage, Alaska (see Figure 1). A previous...

New Admixtures for Cold Weather Concreting
Chemicals were tested for their ability to promote strength gain in portland cement concrete at low temperature. The admixtures depressed the freezing point of the mix water and accelerated...

High-Performance Concrete in All-Weather Deck Pours
A high-performance concrete mix enhanced with a combination of microsilica, superplasticizer, and high dosages of an corrosion-inhibiting, accelerating admixture (calcium nitrite); proved...

Impact of Cold Weather on Building Construction Scheduling
Weather impact on a building construction schedule is often significant in cold regions. Most deterministic scheduling methods are unable to directly account for the effects of weather...

Processed-Snow Foundation Design at the Summit of the Greenland Ice Cap
The design and construction of a processed-snow foundation berm for an elevated building located at the summit of the Greenland Ice Cap is described. Weather conditions and design provisions...

 

 

 

 