Rethinking the Competitive Bid
Concern that the U.S. construction industry is losing its competitive edge is nothing new. Ironically, the problem is not so much rooted in foreign technical expertise as it is in our...

Decentralized Wastewater Management
With the discovery earlier this century that city squalor caused disease, we protected ourselves by piping raw wastes away. Later, when the discharge had transformed rivers into foul,...

Dome Over Orlando
The article describes Orlando's new City Hall, a 267,000 sq ft nine-story reinforced concrete tower, clad in granite-aggregate precast concrete panels and topped by a 120...

School Is In Session
Cost overruns, project delays and the city bureaucracy have given school construction a bad reputation throughout the U.S., particularly in urban centers. But as other construction markets...

PS 5 Sewage Lagoon Embankment Stabilization
In 1981 an embankment containing a three-cell wastewater treatment lagoon was constructed adjacent to the northern edge of the Pump Station 5 gravel pad on the Trans Alaska Pipeline System....

Winter Sewer Construction in Campbell Lake
This paper discusses the winter construction for replacement of the Campbell Lake portion of the Campbell Creek C-5 Trunk (C-5 Trunk) located in Anchorage, Alaska (see Figure 1). A previous...

Numerical Analysis of Frost Shields
The term 'frost sheilding' has been used to describe the practice of using flat stock rigid insulation materials burial above a water or sewer pipe to reduce...

Impact of Cold Weather on Building Construction Scheduling
Weather impact on a building construction schedule is often significant in cold regions. Most deterministic scheduling methods are unable to directly account for the effects of weather...

Processed-Snow Foundation Design at the Summit of the Greenland Ice Cap
The design and construction of a processed-snow foundation berm for an elevated building located at the summit of the Greenland Ice Cap is described. Weather conditions and design provisions...

Environment One: A Master Plan Study for a New Scientific Research Station at the Geographic South Pole
The existing research station at the geographic South Pole is approaching the end of its useful life. This master plan study focuses on determining the technical and functional requirements...

Cold Climate Building Research at Wasa Base, Antarctica
During the Antarctic summer season of 1988-89 a permanent Swedish research station was erected at Dronning Maud Land, Antarctica. The station, named Wasa, is situated on a nunatak. A corresponding...

Use of Rigid Insulation Below Grade for Roadways and Parking Areas
Minnesota Power's Herbert Service Center is located 3 miles north of downtown Duluth, Minnesota. The facility, constructed in 1967, consists of primary buildings, cold storage...

Treatment of Unstable Foundation Areas in Alaska's Pavement Management System
In the State of Alaska Department of Transportation and Public Facilities Pavement Management System (PMS) unstable foundation areas are defined as sections of roadway that experience...

Application of Ice/Structure Interaction Concepts to a Real Time Ice Risk Assessment Computer Model
The successful and safe operation of an Arctic offshore exploration structure greatly depends on the implementation of alerts procedures. In order to assess alerts levels, a computer model...

Risk Assessment for Groundwater Pollution Control
Prepared by the Groundwater Risk Assessment Task Committee for the Water Pollution Management Committee of the Environmental Engineering Division of ASCE. ...

White Steel for Osaka Bay
Wind, earthquake and aesthetics were the design determinations for Japan's Higashi-Kobe Bridge. The designers also had to consider the man-made bay infill site and a directive...

Privatization Takes Flight
The number of air travelers in the U.S. is projected to double by early in the next century. Delays have also been mounting rapidly. Major airports around the world are facing the same...

Tomorrow's Toll Road
Techniques using automatic vehicle identification (AVI) currently provide the most efficient form of electronic toll collection. Several systems have been installed in the U.S. in the...

Houston Moves Forward Again
The National Transportation Plan, as released by Transportation Secretary Samuel Skinner, advocates the construction of toll roads and calls on local governments to devise and finance...

Retrofitting Existing Fossil Plant Facilities
This paper summarizes the contents of and provides some insight into the usefulness a structural engineer will get from the publication 'Retrofitting Existing Fossil Plant...

 

 

 

 

Return to search