Predicting Sediment Loads
Many reservoirs in the U.S. and internationally have experienced unforeseen storage loss when sediment loads exceed those originally predicted during the design stage. This often results...

Smart Structures
Detecting cracks in concrete before they become visible could help prevent structural collapse of buildings and other civil works, say professors at three schools of engineering. The University...

Tying Back a Landslide
A slope covered with landslide debris is never the most desirable site on which to build, but sometimes it is the only one available. For the Forks of Butte hydroelectric power project,...

Ocean Energy Recovery
the State of the Art
This book, Ocean Energy Recovery: The State of the Art, establishes the state of the art in the full range of renewable energy technologies....

Designing for Control of Ice Conditions in Marinas
Each marina or small-craft harbor experiencing ice during the winter months must be designed for site specific conditions. These conditions are governed by environmental factors (geology,...

A Shallow-Draft Icebreaker for the Upper Niagara River
The New York Power Authority (Authority) designed and built a special purpose, shallow-draft icebreaker in 1986 and 1987 for use in the upper Niagara River. The icebreaker is used during...

Wind Power in Antarctica?Case Histories of the North Wind HR3 Wind Turbine
The combination of extreme weather conditons and remoteness of the Antarctic sites makes them even better suited for wind turbine installations since the alternative power sources are...

Valuing Residual Emissions in Electricity Planning
Incorporating the valuation of residual emissions into calculations of social cost permits comparisons among alternative sources of electricity generation inclusive of environmental impacts....

Precipitator Retrofit and Repair: A Case Study
Described is a difficult fossil power station retrofit project performed on a tight schedule at a congested site. Installation of a new supplementary precipitator and structural repairs...

Retrofitting Existing Fossil Plant Facilities
This paper summarizes the contents of and provides some insight into the usefulness a structural engineer will get from the publication 'Retrofitting Existing Fossil Plant...

Hydrogen?The Clean Fuel of Tomorrow is Available Today
This paper examines the role of fossil fuels and advocates a proactive energy policy to stimulate the use of domestically produced 'clean' energy carriers (fuels),...

The PowerBargeTM for Lock/Dams on Inland Waterways
Following a brief description of the prefabricated floating PowerBarge concept, the range of application and expected cost and time savings is presented. Environmental benefits are described...

Preliminary National Evaluations of CO2 Emission Controls
Under the aegis of the International Energy Agency, several countries have begun making comparable studies of the cost-effectiveness of various measures to reduce emissions of carbon dioxide...

Exploring CO2 Emissions Reduction Strategies
Concern for potential climate change resulting from the greenhouse effect may be the biggest factor in energy planning in the 1990s. A 20% reduction in CO2,...

Electric Utility Planning for Greenhouse Concerns
International concerns for the potential of significant climate change resulting from the greenhouse phenomenon have focused increasing attention on the emissions of carbon dioxide and...

Procedure for Seismic Evaluation and Design of Small Bore Piping
Simplified methods for the seismic design for small bore piping in nuclear power plants have been used for many years. Various pipe designers have developed unique methods to treat the...

Anchoring?A New Generation
During the time period of NRC Bulletin 79-02, and certainly afterwards, the use and application of wedge type anchors in Nuclear Power Plants took on a new perspective. The data gathered...

Recirculation Piping Replacement Project at Dresden Unit 3
This paper discusses the Recirculation Piping Replacement Project performed at Dresden Unit 3 during 1985 and 1986. It describes several of the technical and administrative problems associated...

Interim Spent-Fuel Storage Options at Commercial Nuclear Power Plants
Although spent fuel can be stored safely in waterfilled pools at reactor sites, some utilities may not possess sufficient space for life-of-plant storage capability. In-pool storage capability...

Design, Permitting and Initial Operation of a 32 Mw Agricultural Waste Fired Power Plant
Independent power producers are playing an increasingly important role in satisfying the electric power requirements of public utilities. Many of the independent power producers rely heavily...

 

 

 

 