Quality-Assurance Program Description Defense Waste Processing Facility
This paper describes the Westinghouse Savannah River Company's (WSRC) quality assurance program for defense-waste processing at the Savannah River Site (SRS). WSRC is the operating contractor...

Plutonium and Minor Actinide Transmutation by Long Irradiation in LWR
An investigation was made on the conceptual possibility of burning in a thermal reactor MOX fuel together with special pins containing plutonium, minor actinides and long-lived fission...

ATW System Impact on High-Level Waste
Criteria are developed for transmutation system impact on HLW storage that are related to intrusion and long-term risk reduction. Thermal reactor, fast reactor, and accelerator-driven,...

Remote Spent Fuel Handling in France at the La Hague Cask Unloading Facility
French policy for the back end of fuel cycle is based on spent fuel reprocessing. Irradiated spent fuels are transferred in casks from the nuclear reactors to the reprocessing plant where...

Evaluation of Spent Fuel Behavior Under Interim Storage Conditions in Russia
The nuclear power in Russia is based on three types of water cooled power reactors VVER-440, -1000 and RBMK-1000. Two fast sodium cooled reactors-prototypes BN-350 and BN-600 are in commercial...

A Galerkin Method for the Convection?Diffusion Equation Using Asymmetric Weighting Functions
A variation of the Petrov-Galerkin method of solution of a partial differential equation is presented in which the weight function applied to the time derivative term of a one-dimensional...

Heat Transfer in Vertical Concentric Cylinders in a High Level Nuclear Waste Repository
Modeling free convection heat transfer in an cylindrical annular enclosure is still an active area of research and an important problem to be addressed in the high level nuclear waste...

HWVP Compliance with the Hanford Site Solid Waste Acceptance Criteria
This report describes the Hanford Waste Vitrification project (HWVP), which will be located at the Haford Site. The Hanford Site encompasses a 560-mi2...

Tolerance Requirements for Remote Handling at the Hanford Vitrification Project
A new and innovative approach to installation of the many remote nozzles and electrical connectors that must be installed to demanding tolerances has been developed by the architect/engineer...

An Isolated Wetland Used for Stormwater Treatment
A marsh used for stormwater management showed gradually increasing levels of pH, dissolved oxygen and conductivity in the flow path. The system was especially effective in removing suspended...

Water Quality Impacts from Development of Port Ludlow, Washington
Port Ludlow Bay is a tidal estuary located adjacent to Admiralty Inlet in Puget Sound, Washington. A planned development has been under construction along the bay since 1976. A 0.64 mgd...

Water Quality Model of the Chicago Waterway
In 1992, the Metropolitan Water Reclamation District of Greater Chicago (the District) developed a QUAL2E water quality model of the Chicago waterway and Upper Illinois waterway. The model...

Seasonal Water Quality Management Given Sparse Data
An approach for designing robust seasonal water quality management programs for river basins with sparse or short flow records is presented. This approach uses Markov chain modelling and...

A Planning Strategy for Safe Drinking Water Act Compliance
This paper presents a simple planning strategy for drinking water utilities that will allow them to move ahead with system upgrades and specific regulatory compliance programs even though...

Investigation and Rehabilitation of the Moses Lake Larson Wellfield
In 1988, low levels of trichloroethylene (TCE) were detected in several of the Larson wells operated by the City of Moses Lake. The wells are up to 800 feet deep and are completed in fractured...

Strategies for Developing Major Capital Facilities
Siting, permitting, and mitigating impacts present many challenges during the development of major capital facilities. As a result of the need for public involvement, environmental review,...

The West Point Story?Chapter 1: Overview and Planning
The West Point wastewater treatment plant is the Seattle metropolitan area's largest wastewater treatment plant, and it is being upgraded to provide secondary treatment. The planning,...

The West Point Story?Chapter 2: Project Management Approach
In 1985, serving as the program lead, Metro contracted with Lewis Zimmerman Associates to conduct a formal facility planning effort for the West Point wastewater treatment plant. It was...

The West Point Story?Chapter 3: An Integrated Park and Treatment Plant
The West Point Wastewater treatment plant in Seattle sits on a small parcel of land that juts out into Puget Sound. In 1984, controversy erupted when Seattle Metro recognized that West...

The West Point Story?Chapter 4: Design
Metro's approach to design was one of integrated environmental and plant design. The project team, with guidance from the community and the city's parks department, established goals before...

 

 

 

 

Return to search