Planning, Engineering and Constructing the Superprojects
Proceedings of the Engineering Foundation Research Conference held at Asilomar Conference Grounds, Pacific Grove, California, April 30 May 5, 1978. Sponsored by the American Society of...
Applied Techniques for Cold Environments
The proceeding papers cover practical applications of engineering principles to the solution of real world cold regions engineering problems. The book was organized into four major categories:...
Can the U.S. Cope with Skyrocketing Coal Production�
Coal must become the nation's chief tool for increasing energy self-reliance. Coal is abundant. The technology to use it is available today. There is an existing production...
Kamburu Dam: Diversion Conduit Designed into Spillway Saves $1,000,000
Careful coordination of dam construction operation with river stages over several seasons, and a construction sequence that called for building the spillway, in effect, from the top down,...
Productivity on the Construction Site
On-site productivity in construction rose dramatically in the years after World War II as tasks were mechanized and larger equipment introduced. But in the past 10 years, that had gone...
Making Maps by Computer
For making maps, digitizer-computer-plotter systems are increasingly popular. Here are case histories of three applications�by Brooklyn (New York City) Union Gas. Co. for keeping track...
Engineering Foundation; Still Going Strong at 63
An historical review is given about the creation of the EF by Ambrose Swasey in 1914 for issuing research grants and establishing conferences. The initial endowment of $800,000 increased...
Bridge Erection by Launching is Fast, Safe, and Efficient
The construction of long prestressed concrete bridges without using formal falsework or self-supporting launching falsework is described. Using the so-called incremental launching method...
Precast Veneer Replaced By All-Precast Structure
Utilizing engineering solutions to architectural problems greatly enhanced the architectural appearance of this building. Long-span prestressed, light weight concrete beams, post-tensioned...
EPA's New Construction Operations Review Program
Experienced construction engineers from EPA's Headquarters are now visiting numerous sewage treatment construction sites to review the quality of work being done. Behind the...
Seattle Freeway Park; A Scene of Blissful Contrasts
The Seattle Freeway Park was nominated for honorable mention for OCEA. Although not of massive scale and not dramatically innovative in civil engineering design and construction methods,...
The Hackensack Meadowlands Project
The Hackensack Meadowlands Project, which includes a stadium and a racetrack, has reclaimed from the ravages of man and nature a portion of an undevelopable marshland that is larger than...
Vibroreplacement and Reinforced Earth Unite to Strengthen a Weak Foundation
Two relatively new engineering concepts in the U.S. were successfully used to solve a difficult soils problem. A highway skirting Idaho's Lake Pend Oreille was built on a...
The Querverschub of the 2,000-ft Oberkassel Bridge
In 1976 West German bridge engineers undertook the moving of the largest structure ever moved in one piece and in such a short period of time. The Oberkassel Bridge connecting Dusseldorf...
Minnesota Interceptor Sewer Breaks New Ground
The Beltline Interceptor is a gravity interceptor sanitary sewer which has its outlet in St. Paul and its beginning in White Bear Lake. Major requirements called for a design which would...
Ecology and the Past
Archaeologists and paleontologists have gathered an overpowering amount of evidence to show that modern methods of construction, both in the field of highways and in that of architectural...
An Experience in Standardization of Nuclear Power Plants
This article outlines successful efforts at design of five standardized nuclear units, in four different states in the U.S.A., for a group of five utilities. The Standard Power Block,...
Don't Look Up, Look Down
In response to the rising cost of energy, the designers of the Terraset Elementary School, Reston, Va., buried it under 2-3 ft of earth. The resulting high thermal mass allows the building...
The Field Engineer: Political and Legal Scapegoat�
The publicly-employed engineer can be in a vulnerable legal position. A case history is described in which a field engineer was indicted on criminal charges after a bridge collapse (during...
Pasco-Kenneewick Bridge�� The Longest Cable-Stayed Bridge in North America
This 2503-ft long structure, built in an earthquake zone, is only the second of its kind to be constructed in the U.S. It boasts a continuous concrete girder, supported from steel cables...
Return to search