Riprap Design Criteria for the ARS Low Drop Structure
The ARS low drop grade control structure has proven to be an effective means to stabilize incised channels in Mississippi. However, field inspections and laboratory testing have indicated...

Operational Procedures for Estimating Bottom Exchange Rates
After briefly reviewing the terminology of the various bottom and water column exchange fluxes, the body of this paper summarizes five possible procedures for establishing operational...

Overtopping Protection for A. R. Bowman Dam
Arthur R. Bowman Dam is a 245-foot-high (74.7-m) central-core rockfill dam located on the Crooked River in central Oregon. The probable maximum flood (PMF) would overtop the dam by 20...

Design of Groins on the Middle Rio Grande
The Albuquerque Projects Office of the Bureau of Reclamation wanted to use groins in place of revetments at two sites on the Rio Grande. The Bureau of Reclamation has limited experience...

Submerged Vane Projects for Bank Stabilization and Sedimentation Management
Submerged vanes are small flow training devices placed in a stream to eliminate or create secondary currents to direct sediment in a controlled fashion. In recent years submerged vanes...

Bridge Inspections Related to Bridge Scour
The failure of the Silver Bridge over the Ohio River in Point Pleasant, West Virginia, on December 15, 1967 resulted in the establishment of the National Bridge Inspection Standards (NBIS)...

Bridge Scour and Stream Instability Countermeasures
Stream instability is characterized by lateral or vertical instability. Such instability has led to the failure of bridges and loss of life. Lateral instability is caused by lateral migration...

Bridge Scour Research Needs
This paper presents a summary of the Federal Highway Administration (FHWA) priority research emphasis on bridge scour, sedimentation, and stream stability problems. The most persistent...

Rio Moquino Stream Stability and Erosion Protection, Jackpile Uranium Mine
The uniqueness of the Jackpile Reclamation Project and the changes in reclamation technology over the past few years have prompted a reexamination of some of the design criteria specified...

Kings Bay Channel Expansion Hybrid Model Assessment
A hybrid modeling system (coupled physical and numerical models) was developed to assess velocity and sediment impacts associated with channel expansion. Physical model tides and velocities...

A Dynamic Runoff Model for Disturbed Hillslopes
A dynamic runoff model is developed for use in analyzing the hydrologic response of disturbed hillslopes. The model employs an explicit form of the Green-Ampt equation which is coupled...

Cofferdam Rip-Rap Protection for the New Esna Barrage
A 1:60 undistorted mobile bed model of the Nile River in the vicinity of Esna Barrage was constructed at the Hydraulics and Sediment Research Institute to test rip-rap protection of the...

Drought-related West Tennessee Channel Bank Failures
Massive bank failures occurred in 1988 along a 14-kilometer reach of the lower Obion River channel in Dyer County, West Tennessee where the river flows through an abandoned Mississippi...

Characteristics of Low-Slope Streams that Affect O2 Transfer Rates
Multiple-regression techniques were used to derive the reaeration coefficients estimating equation for low sloped streams: K2 = 3.83 MBAS-0.41...

New Experimental Results on the Parameters Influencing Air-Sea Gas Exchange
Gas exchange experiments from large linear and circular facilities are presented which provide some more insight into the influence of waves on the gas exchange process. The experimental...

Ground Stabilization in Shallow Depth Soft Ground Tunneling
A new approach was employed for ground stabilization to drive a semi-circular cross-section tunnel with overall dimensions of 24 ft (7.3m) wide, 12 ft (3.7m) high, and 164 ft (50.0m) long....

Riverbank Renewal
In Providence, project teams from the public and private sector worked side-by-side, rerouting two rivers and constructing a new corporate headquarters. What made the task more challenging...

Detection of and Construction at the Soil/Rock Interface
This proceedings, Detection of and Construction at the Soil/Rock Interface, consists of papers presented at the Symposium held on October 24,...

Pumping Oil, Treating Soil
Oil was discovered on hilltop land in Signal Hill, Calif., in 1921, setting off one of the most wild land rushes the state has ever seen. Some 70 years and 20,000 oil wells later, the...

Progressive Failure Probability of Soil Slopes Containing Geologic Anomalies