Pile Installation and Testing at Ningbo Port, China
As part of an ambitious development program at the Port of Ningbo, the People's Republic of China constructed a 694 m (2277 ft) long offshore pier structure to provide a container berth...

Analysis of a Wharf for a Container Terminal
A balanced combination of sophisticated computer programs was employed to model the soil strata, foundation and structure of a wharf for a new container terminal in the Port of Topolobampo,...

Deep Water Container Wharf & Crane Foundation
A deep water anchored steel bulkhead and a parallel-independent low-profile, pile supported crane rail foundation with special stowage areas are discussed from soils investigation, through...

Application of Traffic Engineering Concepts to Pleasure Boat Traffic
The Los Angeles County Department of Beaches and Harbors initiated a study to investigate the feasibility of adding slips along the main channel in Marina del Rey in response to the surplus...

Case Study ? Elliott Bay Marina Floating Moorage
The recently completed Elliott Bay Marina project in Seattle is one of the larger projects of this type in the country, with 1196 slips ranging from 32 feet to 60 feet, a floating fuel...

Design of Marina Replacement Facilities
A majority of the waterfront design projects within the State of California are for the replacement of existing facilities since the densely populated shoreline areas are already heavily...

Soil Contamination Issues at Port Marine Terminals
A preliminary survey of hydrocarbon contaminated soil and groundwater problems in U.S. west coast ports indicates that the problem occurs in most major port areas. Using the Port of Los...

Clean-Up of Contaminated Soils: A Necessary First Step in Industrial Land Redevelopment
This is a paper describing efforts by The Toronto Harbour Commissioners to demonstrate how several technologies can be effectively integrated to remove or reduce contaminant levels in...

Securing Strategic National Security Objectives Through Maritime Activities
The President's national security strategy envisions a healthy and growing economy, wise environmental stewardship and a strong military as part of his plan to meet and to fulfill the...

Pile Lateral Load Test in the Port of Los Angeles
Recent wharf projects in West Coast ports have featured rock dikes to contain backland fill and the use of vertical piles embedded in the rock dikes to resist lateral loads. This paper...

Batter Piles and the Seismic Performance of Pile-Supported Wharves
This paper discusses the role of batter piles in the seismic performance of wharves, based on the results of a nonlinear soil-structure interaction analysis of a pile-supported wharf with...

Pile Driving: Can it Cause Slope Movement?
The potential for slope movement from pile driving is examined in this paper. Published information is reviewed to identify the primary causes of movement, which are 1) displacement of...

Riprap Design in Marine Terminals
Navigation vessels in otherwise quiescent waterways sometimes generate forces that require stabilization of the bed or banks. Since riprap is an accepted and dependable means to armor...

Measured Fill Performance at Berths 212-215 in the Port of Los Angeles
This paper summarizes the performance of an instrumentation fill constructed in open water in the Port of Los Angeles (Port). A new container-handling facility was constructed that consisted...

Proposed Seismic Design Method for Piers and Wharves
Current seismic provisions of the 1991 Uniform Building Code (UBC-91) and the 1983 AASHTO Seismic Design Specifications (AASHTO) are compared as they relate to piers and wharves. An alternate...

Earthquake Damage Repair and Retrofit of the Seventh St. Terminal Port of Oakland
The October 17, 1989 earthquake resulted in the collapse of the two-level Cypress St. Freeway in Oakland. Television and newspaper coverage revealed the tragic loss of life and property...

Dredging Contaminated Sediments: A Monitoring Plan for Boston Harbor
Dredging and blasting will be conducted in Boston's Inner Harbor over approximately a one-year period during construction of the Third Harbor Tunnel. The silty organic surface sediments...

Seismic Survey Considerations in the Planning and Design of Dredging Projects for Marine Terminal Facilities
This paper presents a case study of the value of high resolution seismic survey information when planning and designing a dredging project for a marine terminal facility. Advances in high...

A Removable Submarine Cover for Drydock No. 2 Modernization
In order to provide balanced overhaul capability and flexibility in the 1990's and beyond, the Portsmouth Naval Shipyard in Kittery Maine, a major U.S. Navy submarine and overhaul repair...

U.S. Navy Deployable Waterfront Facility
The U.S. Naval Civil Engineering Laboratory (NCEL) has been developing the concept of a Deployable Waterfront Facility (DWF) as part of its technology development programs for the enhancement...

 

 

 

 

Return to search