Nonlinear Hydrodynamic Pressures on Dam Faces with Arbitrary Reservoir Shapes
A finite-difference method was used to calculate the nonlinear hydrodynamic pressures acting on the rigid dam faces during earthquakes. The geometry of the reservoir is in a realistic...

Performance of Prototype Aerating Weirs Downstream From TVA Hydropower Dams
TVA has constructed aerating weirs below certain of its hydropower dams to (1) increase tailwater dissolved oxygen (DO) content during generation, and (2) improve minimum flows between...

Reducing the Potential Downstream Impacts of a Dam Failure
The dam safety regulations imposed by the individual states in the United States vary widely and provide inconsistent protection for the citizens of different states. The proximity of...

Disaster Reduction in Dam and Reservoir Design
Disaster reduction for small- and medium-sized reservoir projects is considered for two specific types of dam failure: 1) during extremely high floods, and 2) when severe reservoir silting...

The Coyote Dam Outlet Works Replacement Project: Hazard Reduction
The Santa Clara Valley Water District's Coyote Dam faced three major concerns: siltation of the existing outlet; a fault that crosses the existing outlet pipe; and the dam toe and the...

Uncertainties of Tailwater in an Inundation Study: Dam Upgrade Optimization for Hazard Reduction
When an upgrade is required for a dam with an inadequate spillway system, the potential impact of tailwater during an extreme storm in an inundation study should be considered. This paper...

Analysis of Cabinet Gorge Dam
After a 1987 inspection of the Cabinet Gorge Dam, Part 12 consultants contracted by Washington Water Power (a private utility based in Spokane, Washington) made several recommendations...

Dam Safety Modifications for Clear Creek Dam Manuscript for ASCE Hydraulics Division 1993 National Conference on Hydraulic Engineering
Clear Creek Dam, an unsafe thin arch dam, was stabilized by constructing a concrete gravity buttress on the downstream face. During the Bureau of Reclamation's (Reclamation) Safety Evaluation...

New Austrian Dam Side-Channel Spillway
The Loma Prieta earthquake of 17 October 1989 damaged the chute spillway at the Austrian Dam near San Jose, California. The replacement spillway, with a higher design discharge of 11,500...

Bartlett Dam Fuseplug Auxiliary Spillway
Bartlett Dam is located approximately 77 km northeast of Phoenix, Arizona on the Verde River. The Bureau of Reclamation (Reclamation) has determined that the structure is not capable of...

Screening of Bridges in New Jersey for Scour
New Jersey Department of Transportation has embarked on a program to evaluate all existing bridges over waterways to assess their vulnerability to failure by scour. The Stage I (Screening...

New Jersey Bridge Scour Evaluation Program
The New Jersey Department of Transportation has undertaken an ambitious scour evaluation program for the existing waterway bridges in the state. The methodology developed and utilized...

The Dam Safety Process
A safe dam is one which performs its intended functions without imposing unacceptable risks to public safety, property, and welfare by its presence. Ensuring the safety of a dam requires...

Risk Analysis of River Bridge Failure
The proposed procedure to determine the risk of river bridge failure is based on observations and analysis of river bridge failure data of more than 300 U.S. bridges, 180 South African...

Bureau of Reclamation Downstream Hazard Classification
An overview of the downstream hazard classification process used by the Bureau of Reclamation (Reclamation) and other U.S. Department of the Interior (DOI) agencies for the safety of dams...

Using Threat to Life Studies to Guide Dam Safety Decisions
Ensuring that Bureau of Reclamation (Reclamation) dams do not present unacceptable risks to public safety, prosperity, and welfare serves as a primary objective of Reclamation's Safety...

Economic Aspects of the Bureau of Reclamation Safety of Dams Program
The paper briefly examines economic aspects of the Bureau of Reclamation (Reclamation) Safety of Dams (SOD) program evaluation process. Procedures described include the downstream damage...

Reclamation's Design Process of Early Warning Systems for Dam Safety
This paper discusses the Bureau of Reclamation's process for designing the detection and decision making components of an Early Warning System (EWS) for dams with hydrologic deficiencies....

Emergency Action Plan
Although most dam owners have a high level of confidence in the structures they own and are certain their dams will not fail, the Bureau of Reclamation (Reclamation) included, history...

The Fallacy of Local Abutment Scour Equations
Existing laboratory model studies for quantifying local abutment scour deviate significantly from conditions typically found in the field. This has resulted in predictive local abutment...

 

 

 

 