Numerical Modeling of Proposed Channel Designs (J. F. Baldwin III), California
Ship simulator studies of proposed improvements to navigable waterways are a very important part of any assessment. The John F. Baldwin Channel (JFB) Project (Phase III) is a ship channel...

The Benefits of U.K. Guidance for Temporary Works
In British contracts the Contractor is responsible for the design and execution of temporary works unless the Design Engineer or the Client expressly instruct how the work is to be undertaken...

Current Legal Issues Impacting Temporary Works in Construction
There are two evolving areas of legal concern to the engineer and contractor involved in any aspect of temporary construction. The interpretation and application of the Occupational Safety...

Limit States Design of Wooden Formwork for Concrete Walls
Load and resistance factors are developed for ultimate limit states design of wooden formwork components for concrete walls when the lateral concrete pressures are computed using the ACI...

FHWA'S Bridge Temporary Works Research Program
The Federal Highway Administration (FHWA) has developed a research program to address bridge falsework design and construction. This resulted from the collapse of the Route 198 bridge...

Development of Standards for Slipform & Jumpform Works
Review of past work indicates substantial effort has been made to publish construction standards and guidelines for slipforms but published material pertaining to jumpforms is scarce....

Fall Protection & Debris Containment During Construction
The purpose of this paper is to review the current practices in the United States for both fall protection and debris protection during high rise construction. A performance comparison...

Temporary Lateral Support System for Historic Building Facades in Boston
This paper describes a system of vertically cantilevered structural steel trusses, designed by the author, that provided temporary lateral support for a group of five and six story, 120...

Who Pays for the Unexpected in Construction: Hi-Rise Engineers Point of View
The unexpected in high-rise construction can be traced to design criteria evolving from environmental models and probes, as well as 3 general problems dealing with quality control in contract...

Construction and Robotics: Problems and Solutions
The role of robotics in construction, and the role played by construction engineers (CE's) is placed in perspective. Robot development, like machine manufacture, has always...

Productivity Applications: 3D Models & Simulation
Background. Although three-dimensional computer models have been used to some degree in practice by a few large engineering and construction firms, there has been little research into...

Graphical Database for Construction Planning and Cost Control
Stone & Webster Engineering Corporation is using Computer Aided Construction (CAC) System that integrated construction planning with estimate development, schedule generation,...

Project Controls on the Channel Tunnel Project
Establishing controls for a multi-facted, multi-billion dollar, privately financed, project which is run by two organisations created solely for that one project has been a major challenge....

A Framework for Reasoning About CAD Data
A system capable of reasoning about CAD data offers the opportunity to substantially improve a design or a construction plan by providing feedback about an engineer's artifact. This paper...

Integration of CAD and Knowledge-Based Systems?An AI Architecture
This research focuses on the use of CAD-KBSs integration as a tool for increasing constructability in design and accomplishing construction management functions. Beyond the drafting ability,...

Reasoning for Data Integration
Improving the inter-disciplinary communication of design and construction data is an important objective in improving the competitiveness of our construction industry. This paper discusses...

Design and Construction Integration Using Object Oriented Project Model with Multiple-Views
Generating, sharing and maintaining project data among multiple disciplines and throughout a project life cycle is difficult task in the highly fragmented A/E/C industry. Presently, the...

Integrating the Processes of Design, Scheduling, and Cost Estimating Within an Object-Oriented Environment
This paper describes the conceptual design of several processes for performing the stages of building design, construction scheduling, and cost estimating within an object-oriented environment....

The Virtual Design Team: An Object-Oriented Model of Information Sharing in Project Design Teams
The Virtual Design Team (VDT) is an object-oriented, discrete event simulation of a multidisciplinary design team in action. The VDT models a design task as a network of design and design...

Requirements of Object-Oriented Databases for Supporting Collaborative Engineering
Object-oriented programming is gradually evolving into a popular and standard paradigm for large software application development. Typical examples include computer-aided design and engineering...

 

 

 

 