Trans Alaska Pipeline
This is one of the most extraordinary projects contending for the OCEA awards. Examples: the 360 mile haul road built in one summer; the 29 construction camps, self-contained cities to...
Newark Airport Pilots Cost-Saving Runway Paving Concept
The NYC Met Section nominee for the 1978 Outstanding Civil Engineering Achievement Award was the expansion of Newark International Airport. The $200 million redevelopment included a new...
Isn't a Subway for Washington, D.C., Just the Thing�
After 100 years of dreaming and 10 years of design and construction, more than 22 miles and 28 stations of the Washington, D.C., Metro are now in revenue operation. When completed in 1983,...
Rx for Drought: Pumping Plant to the Rescue
Designed and built by the East Bay Municipal District, the pumping plant built last year at Middle River, Calif. was not unusual in design. What was unusual was the speed with which it...
Land Treatment: An Alternative Technology for Wastewater Management
The 1977 Clean Water Act provides some strong incentives for increasing the use of less costly, less energy intensive technology for municipal wastewater treatment facilities. Specifically,...
Mechanization Speeds Limestone Production
The Dravo Lime Company's limestone mine and processing facility was nominated for an Outstanding Civil Engineering Award because it is a well-planned and executed construction...
Controlling Tunnel-Lining Costs�Tips for Owners and Designers
Emphasis is placed on those aspects of design likely to lead to cost savings or the avoidance of unanticipated extra cost during construction. Tunnel lining design requires knowledge about...
Mammoth Prefab Modules Speed Alaskan Oil
Accomplished in conjunction with construction of the Trans-Alaska Pipeline were the mammoth prefabricated modules erected at Prudhoe Bay on the North Slope oil fields; purpose is oil and...
Prefab Structural Components Solve Expansion Problem
Another story was added onto an existing low-rise building, where soil strength was so low that the new floor had to be built by sinking new columns down to a sounder stratum, placing...
Corps Developing Wildlife Habitat to Solve Disposal Problems
The large volume of sediments dredged each year by the Corps of Engineers from navigable waterways can be considered a resource instead of a waste product, and used as a substrate for...
Subway Designs and Construction Methods That Cut Costs
The high cost of subway construction in the United States can be reduced by adopting station and track structure configurations, structural systems, and construction techniques best suited...
Reliable Structural Weldments for Critical Service
Fracture control plans are considered in light of weldment rather than base material alone. Data are presented on the probability of base materials (i.e., plate) having adequate toughness...
Subway Structures Good, Other Elements Need Rehab
Capital spending priorities of New York City's Transit Authority have shifted, as it postponed indefinitely the construction of all but one new line�the line from 63rd St....
Bridges and Highways � Serious Deterioration Being Attacked Aggressively
Due to years of starvation of maintenance and reconstruction budgets, New York City's backlog of road and bridge reconstruction needs is huge. The city has 5,300 miles of...
How New York City Can Be Restored to Economic Health
To be restored to economic and fiscal health, New York City will have to make some fundamental reforms. The overall strategy is to obtain slack resources, then to invest these resources...
Dominance of Special Interests Dashes NYC Hopes for Recovery
How well is New York City doing now? Is it really on the way to recovery? Since the landmark report by the Temporary Commission on City Finances was released over a year ago, very little...
Planning, Engineering and Constructing the Superprojects
Proceedings of the Engineering Foundation Research Conference held at Asilomar Conference Grounds, Pacific Grove, California, April 30 May 5, 1978. Sponsored by the American Society of...
Applied Techniques for Cold Environments
The proceeding papers cover practical applications of engineering principles to the solution of real world cold regions engineering problems. The book was organized into four major categories:...
Kamburu Dam: Diversion Conduit Designed into Spillway Saves $1,000,000
Careful coordination of dam construction operation with river stages over several seasons, and a construction sequence that called for building the spillway, in effect, from the top down,...
Productivity on the Construction Site
On-site productivity in construction rose dramatically in the years after World War II as tasks were mechanized and larger equipment introduced. But in the past 10 years, that had gone...
Return to search