Life at the End of the Tunnel
Deadly tunnel fires in Europe have raised new concerns about tunnel fire safety around the world. Modifications to structures, mechanical systems, and operating procedures can make new...
The Pentagon Project
The renovation of the Pentagon, now under way, is one of the most ambitious, complex, and challenging construction undertakings in contemporary history. It entails the equivalent of demolishing...
Fast Forward
Under the aegis of the French government, the Soci�t� Nationale des Chemins de Fer Fran�ais (French National Railway Society), or SNCF, has built two new bridges, each approximately 1,100...
Rethinking Bangkok's Wastewater Strategy
In the past 10 years the Bangkok Metropolitan Administration has spent $1 billion developing a major wastewater collection and treatment program for the city of Bangkok. The city is presently...
Foundations and Ground Improvement
This proceedings,
Geotechnical Testing, Observation, and Documentation
A geotechnical report, field and laboratory testing, as well as observation and documentation are all integral parts of most geotechnical projects. A technician is usually dispatched to...
International Boundary and Water Commission, United States and Mexico, United States Section
(Abstract Only) The International Boundary and Water Commission, United States and Mexico, is responsible for applying the boundary and water treaties between the United States and Mexico....
Preliminary Assessment of Bacteria Abundance in Rivers of the Pantanal Wetlands -- Brazil
Heterothrophic bacteria play an important role in the carbon flux of aquatic environments, specially in flooded areas, where they are considered to be a source of organic matter. They...
Outstanding Civil Engineering Achievement Award and Award of Merit for 2001
The outstanding civil engineering achievement award (OCEA) recognizes civil engineering projects that contribute to community well-being, demonstrate resourcefulness in planning and solving...
A Natural Approach
Before the Comprehensive Everglades Restoration Plan began, the Florida legislature established the Everglades Construction Project (ECP), a $708-million, 10-year program now being implemented...
Replacement Strategy
Water Works II, a $275-million water treatment plant currently under construction in Detroit, is redefining the way that such projects are let and built. In 1980 the city initiated a program...
Marketing Your Web Site
Most companies in the engineering and construction industry have had their own Web sites for some time. But experts warn that generating traffic from potential clients, job seekers and...
25 Technologies to Watch
While much hype exists over the concept of e-commerce, an expert in design and construction information technologies points out that there are many other technologies in the developmental...
Stabilizing a Crater Rim
A geocell and geogrid reinforced soil slope concept was selected to stabilize approximately 120 m of eroding and unstable portions of the crater rim at the National Memorial Cemetery of...
Rebuilding America's Infrastructure
During the years immediately following World War II, the United States built the greatest infrastructure in the modern world. As we move into the 21st centruy, however, we find that this...
Planning Applications Constructed Wetlands for Wastewater Treatment or an Avian Habitat in the Desert?
The debate of wetlands constructed for wastewater treatment or biological habitat continues. How a desert site is planned to meet both challenges is presented....
A Constructed Wetland for Wastewater Treatment in the Coachella Valley, Indio, California
The Coachella Valley Wild Bird Center (CVWBC) proposed a wetland habitat site on 22 acres property in India, California, under lease from Valley Sanitary District. The District currently...
Adaptive Management for Atchafalaya Basin, LA Water Management Units
The Buffalo Cove Water Management Unit is a pilot unit in the Atchafalaya Basin that has been implemented as part of the Atchafalaya Basin Floodway System project. The pilot unit goals...
Taking Treatment to the Extremes
Designing a wastewater treatment facility that meets current environmental guidelines can be challenging enough. But designing it so it can be shipped, constructed, operated, and maintained...
Towering Achievement
A new headquarters complex being constructed for Goldman Sachs in New York City will rise where a Colgate factory once stood. The complex will incude a high-rise main building, a mixed-use...
Return to search