Application of Digital Image Processing in Morphological Analysis of Geotextiles
Geotextile filters are rapidly replacing graded granular filters in dams, landfills, edge drains, and retaining walls. The design of these filters requires morphological information about...

Machine Vision Based Traffic-Adjusted Intersection Signal Control
This paper describes some of the available machine vision systems and how they can be effectively used for traffic control at an intersection. A set of rules have been defined which make...

Interactive Digital Image Feature Analysis as Applied to Cement and Concrete Microstructural Investigations
A novel procedure involves interactive chemical image analysis of separable features in the backscattered image. In this procedure a backscatter image is acquired by the image analysis...

Digital Evaluation of Contaminated Sites
This paper introduces digital techniques to evaluate historical maps and aerial photographs in order to detect contaminations on derelict industrial sites. Special attention is paid to...

Survey: Fundamental Pavement Crack Imaging Algorithms
Many algorithms for distinguishing pavement cracks from background noise are based on the geometric characteristics of noise, such as shape and size. The objective of this paper is to...

A New Three-Dimensional Modeling Technique for Studying Porous Media
A new three-dimensional technique for modeling the micro-structure of porous media is proposed. On the basis of measurements of characteristics made using thin sections of porous media...

Image Analysis for Interparticle Contact Modeling
Two dimensional photoelastic elements (disks or ellipses) are used as models for studying granular material behavior. The required observations include accurate continuous measurements...

Displacements in the Soil Near a Tunnel Face Using Centrifuge Tests and Image Processing
Image processing is applied to measurements of the soil for a tunnel model in centrifuge. For this aim a specifical device has been developed on the LCPC centrifuge (Nantes, France) and...

Application of Digital Images and Processing for As-Built Construction Drawings
The production of as-built drawings is a labor intensive activity that often provides the facility owner with inaccurate or incomplete final drawings. This paper briefly reviews work accomplished...

A Constructability Lessons Learned System for Infrastructure Rehabilitation Using Digital Image Processing
Due to the complex nature of many infrastructure rehabilitation projects, there is a strong need for design/construction integration, and more specifically, the application of strong constructability...

Optimal Region Aggregation with Shape Considerations in Spatial Optimization
The region aggregation (land acquisition) problem is discussed within the context of a regular grid matrix having representative cell indices or attribute values. Several optimization...

Pavement Design Considerations for Heavy Aircraft Loading at BAA Airports
BAA operates seven airports in the United Kingdom. Two of them, Heathrow and Gatwick, handled 61 million passengers in 1991 with 543,000 air transport movements, 25% by wide-bodied aircraft....

Densification of Asphalt Pavements by Traffic
Since asphalt pavements rut when the voids are filled with asphalt (and voids can become filled by traffic densification) the voids that develop under traffic are vital to any mix design...

The Fundamental Gap in Urban Transportation
This is not a technical paper. It is perspective paper, designed to detail the failure of current urban transportation strategies and call for new thinking and action responsive to the...

Las Vegas?A Significant APM Market
Las Vegas, the gambling and entertainment center of the nation, contains the world's largest concentration of hotels and casinos, and attracts over 18 million visitors a year. APMs have...

Determining AGT Feasibility and Potential Alignments for Mission Valley
The objective of the Mission Valley Guideway Transit Study was to assess the feasibility of developing a completely elevated, fully automated guideway transit system to serve as a circulator/distributor...

Hiroshima Seibukyuryo New Town and the New Transit System
This paper introduces a project that will have far reaching social, economic, and cultural significance and which has been labeled as one of the projects that will initiate development...

The New Transit System Plan for Sendai City
It is observed recently in Sendai City that the motor traffic from suburban residential areas to the city center is rapidly increasing and incoming cars are often delayed in the morning...

APM Activities in Gothenburg
The Gothenburg Traffic Authority has found that new traffic policy goals are very difficult to achieve with conventional public transport techniques. Two studies on new concepts have been...

Infrastructure
Planning and Management
This proceedings, Infrastructure Planning and Management, consists of papers presented at two parallel conferences held in Denver, Colorado,...

 

 

 

 

Return to search