Reversibility Measures for Sustainable Decisions
Increasing stress on the environment and current norms of sustainable development have prompted the formalization of new approaches to decision making. This may be achieved through the...

Operational Aspects of Warning
Uzbekistan is referred to as the region where the most dangerous natural phenomena are: mudfloods, floods, and avalanches. During the last decades the areas of their manifestation were...

Border Environment Cooperation Commission: 1995 Year End Status Report
1995...What a year! The Border Environment Cooperation Commission (BECC) opened its doors in February 1995, to lay the foundations of the organization whose purpose is to identify, develop,...

Floodplain Analysis of the Lower Santa Margarita River in Camp Pendleton Marine Air Base, California
Floods of 1993 caused extensive flooding of the Santa Margarita River, and significant damage to Camp Pendleton. A floodplain analysis was performed including an assessment of recent flood...

Evaluation of Potential Impacts to Endangered Species that Use Wetland Areas: A Case Study
A proposed runway extension in an airport adjacent to a large riverine system and containing a small perennial branch of the riverine system would result in loss and modification of forested...

Santa Ana River Mainstem Project
The Santa Ana River Mainstem Project consists of seven major features including the construction of 550 ft. high earth and rockf ill dam; raising the embankment by 28 feet of Prado Dam,...

Benefits of the Santa Ana River Mainstem Project
1. Need for additional flood control in Orange County. A. Orange County flood history. B. Increasing Population and development. C. Santa J River flood threat today. 2. How the Santa Axia...

Central Artery/Tunnel (CA/T) Project Environmental Permitting
The Central Artery/Tunnel Project is one of the largest public infrastructure projects in the United States. As such it poses major environmental planning and design challenges. The environmental...

PCE in Dewatering Flows?A Case Study Risk-Based Clean-Up Action Levels
Up to 70 micrograms per liter (?g/L) of tetrachloroethylene (PCE) was detected in dewatering flows associated with a construction project (Project) in the City of Los Angeles. Because...

Impacts of NAFTA on Environmental Engineering
This paper addresses recent developments in the environmental sector under the North American Free Trade Agreement (NAFTA). The North American Free Trade Agreement (NAFTA) represents a...

Computing Flood Damage Reduction Accomplishment
Following flood events, the damage reduced by a federal flood damage reduction project must be computed to inform the public and assist officials in making decisions. This paper will describe...

Sanata Ana River Project Environmental Compliance with the National Environmental Policy Act (NEPA)
The National Environmental Policy Act(NEPA) was first enacted in. 1969, and became effective as of January 1, 1970. The law was intended to ensure that balanced decision-making occurs...

European Progress on river Renaturalisation
Most restoration projects in Europe have been designed to maximise species richness with little regard for channel stability. To recreate a sustainable natural channel it is necessary...

Ecological and Biological Considerations in River Restoration
When planning river restoration projects, proper consideration must be given to the target resources of concern. This should include provisions to meet the physical, hydraulic, and biological...

Anaheim State-of-the-Art Water Treatment Plant?Six Years from Conception to Completion
After six years of intensive planning, budgeting, pilot testing, design, and construction, the City of Anaheim, California, has successfully completed the modifications to the 15 mgd Lenain...

ASR Case Study?City of Salem, Oregon
The City of Salem, Oregon is developing an Aquifer Storage and Recovery (ASR) system to provide a 20 mgd capacity, 440 mg volume, emergency storage and peak day supplementary supply. When...

Economic Risk Analysis as a Research Directing Paradigm
Risk analysis could be used to direct a manageable, prioritized strategic plan for evaluating bridge scour research needs. Through risk analysis, the costs of research and the potential...

San Diego County Water Authority's Emergency Storage Project: A Major Planning Achievement
The San Diego County Water Authority (Authority) has been actively working to maximize the security of the future water needs of the community it serves. The Emergency Storage Project...

Improving the Speed of Double Lockages
The size of tug and barge combinations on the Upper Mississippi River and Illinois Waterway frequently exceed the dimensions of the lock chambers they must pass through. The locks on these...

The Sawmill Creek Watershed Restoration Project
The Sawmill Creek project is a comprehensive watershed restoration effort. The goal is to demonstrate that existing programs can be coordinated in order to improve water quality, and habitat...

 

 

 

 