Electrokinetic Cleanups
Electrokinetic remediation of contaminated soils is a relatively new research area. Electrokinetic phenomena can be used to create barriers, and move particles, including pollutants such...
The Caisson Solution
Detroit is expanding its wastewater treatment plant to drastically reduce combined sewer overflows. The expansion, however, is being done on an extremely congested 4 acre tract of land...
Norway's Olympic Cavern
A mountainous task had been undertaken by Norwegian firms in constructing the world's largest in-mountain colosseum for the 1994 Winter Olympic Games in Norway. The Norwegian...
Civil Engineering in the Oceans V
This proceedings is a collection of technical papers presented at Civil Engineering in the Oceans V (CEO V) specialty conference held at College Station, Texas on November 2-5, 1992. Initiated...
Overview of Acid Mine Drainage Control Strategies
Since 1970, regulations requiring proper overburden sampling techniques to obtain representative geologic profiles and outline specific overburden analysis to determine acid-producing,...
Weapons Test Seismic Investigations at Yucca Mountain
Yucca Mountain, located on and adjacent to the Nevada Test Site, is being characterized as part of an ongoing effort to identify a potential high-level nuclear waste repository. This site...
Performance Assessment in Early Phases of the Repository Design Process
Assessments of post-closure performance are an integral part of the design process for a repository for high-level nuclear waste. They provide input to the establishment of design requirements...
Design Considerations for the Yucca Mountain Project Site Characterization
The Site Characterization Facilities (SCF) to be located in volcanic tuff at Yucca Mountain is a challenge to manage, design, and construct. This challenge is a result of a number of factors....
Application of QA Grading to Yucca Mountain Site Characterization Project Items and Activities
Grading is the act of selecting the quality assurance (QA) measures necessary to develop and maintain confidence in the quality of an item or activity. The list of QA measures from which...
Interpretation and Modelling Process of Bedrock Structures for Site Evaluation in Finland
The repository site for the final disposal of spent nuclear fuel in Finland will be selected by the end of the year 2000. Preliminary site investigations have been made in five areas since...
Assessment of Fracture-Sampling Techniques for Laboratory Tests on Core
As part of the site characterization work to be done at Yucca Mountain in Nye County, Nevada, a candidate site for the first mined-geologic repository for high-level nuclear waste, laboratory...
How Much Must the Geologic Barrier Contribute to Safe HLW Disposal?
As a prerequisite of a potential repository site, it is important to assess the role of each system component in providing safety and, in particular, to establish the specific geological...
Nagra's Information Strategy 1991
This paper discusses the acceptance problems faced by nagra, opinion research as a basis for action, the nagra message, transmission measures, communication levels, instruments of communication...
Development of Preliminary Nevada Transportation Accident Characteristics
The U.S. Department of Energy (DOE), Yucca Mountain Site Characterization Project Office (YMSCPO) has been given the responsibility for characterization of the potential repository site...
Development of Rail Access to the Proposed Repository Site at Yucca Mountain
In accordance with the Nuclear Waste Policy Amendments Act of 1987, Yucca Mountain was designated as the initial site to be investigated as a potential repository for the disposal of high-level...
Process and Criteria for Valuation of the Ground-Water Flow Models in the OECD/NEA International Stripa Project
In 1986, the Site Characterization and Validation (SCV) Program was initiated as part of Phase III of the OECD/NEA International Stripa Project. The principal intent of the SCV Program...
Test and Evaluation of Natural Barriers at Yucca Mountain, Nevada: Management of the Site Characterization Program
The U.S. Department of Energy (DOE) is responsible for managing a characterization program for the Yucca Mountain site to collect data needed to determine if the site is suitable for recommendation...
Conclusions from Project-90 With Regard to a Regulatory Framework
A five year performance assessment program, Project-90 [1], has been concluded by the Swedish Nuclear Power Inspectorate, SKI. The project was defined to develop independent assessment...
Performance Assessment Calculational Exercises (PACE-90): Overview and Summary
PACE-90 was undertaken by the Yucca Mountain Site Characterization Project in order to develop expertise in computational capabilities and to aid in identification of critical elements...
Preliminary Performance Assessment of a Nevada Test Site Waste Disposal Facility
The performance of the Nevada Test Site Greater Confinement Disposal (GCD) site was assessed against the Environmental Protection Agency's (EPA) requirements for disposal...
Return to search