Cable Access
By moving the expansion joints off the main, cable-stayed span and creating innovative cable connections and tower configurations, Parsons Brinckerhoff Quade & Douglas Inc. (PB)...
Through Frozen Ground
The most difficult section of the Massachusetts Bay Transportation Authority's (MBTA) Silver Line transit corridor project is approximately 112 m (400 ft) of tunnel below...
Dam Breaching: The Rest of the Story
The U.S. Army Corps of Engineers is evaluating the possibility of breaching four dams on the lower Snake River to improve salmon migration. Because significant infrastructure modifications...
Yesterday's Data�Tomorrow
Before the advent of computer-aided design (CAD) and geographic information systems (GIS), keeping documentation for future usage was no problem. All an engineer had to do was make sure...
Into the Fourth Dimension
A team of contractors designed a pharmaceutical plant entirely in 3-D CAD, then linked the renderings to a cost program and scheduling software, adding a fourth dimension�time�to the process....
Analysis, Design, Construction, and Testing of Deep Foundations
This proceedings,
Metal Building Systems: A New Look
The use of metal building systems in low-rise, non-residential construction under 150,000 square feet has grown from less than 50 percent in 1986 to almost 70 percent today. Such systems...
Resolution Solutions
Disputes over such issues as change orders, extra work, delays, or defective work are an inescapable part of the construction process. By designing an effective dispute management program...
Power Struggle
The Florida Light and Power Company could have replaced its deteriorating, H-shaped wooden power poles in the Tomoka River with exact duplicates, but they chose to use hybrid steel-and-concrete...
Program Management B.C.
Through a process of forensic analysis that applied modern-day technology to bridge the chasm of time, a team of construction managers with the international architecture/engineering/construction...
Dynamic Groundwater Remediation Design with Genetic Algorithms
In groundwater remediation design it has been shown that dynamic policies, in which the pumping strategies may vary throughout the remediation period, can result in more cost-effective...
Sensitivity of Stormwater Conveyance System Cost to Design Recurrence Interval
(No paper) The cost of a piped and/or swaled stormwater system is determined principally by the storm recurrence interval (e.g., 5-year design storm) used to design it. That is, the present...
Environmental Restoration and Management of the Tres Rios Demonstration Constructed Wetland Project: Mosquito Monitoring, Control and Management Efforts
(No paper) The Tres Rios Demonstration Constructed Wetland Project in Phoenix, Arizona, is providing valuable information on the role of constructed wetlands in ecosystem restoration,...
A Leadtime Driven Flood Warning Response Plan Design
(No paper) The paper examines the optimal combination of predictive and detective capabilities in the development of the Wickenburg Flood Response Plan and extrapolates those findings...
City of Sedona Wastewater Reclamation Plant Upgrade: How to Teach an Old Dog New Tricks
(No paper) The City of Sedona's early 1990's wastewater treatment plant was difficult to control, prone to plant upsets, near capacity and often experienced on-site sewage spills. Additionally,...
Sizing Up Seismic Bearings
Today in the U.S., there are two general technologies available to protect new and existing bridges from the damaging effects of earthquakes. One type, seismic isolation bearings, provide...
Bridge Safety and Reliability
Sponsored by the Structural Engineering Institute of ASCE. This report covers a wide range of applications of modern structural safety and reliability...
A Safer Route
More than 42,000 people died in transportation-related incidents in 1997, making motor vehicle accidents the leading cause of death for individuals between age one and 34. Engineers are...
Stream Stability and Scour at Highway Bridges
Compendium of Stream Stability and Scour Papers Presented at Conferences Sponsored by the Water Resources Engineering (Hydraulics) Division of the American Society of Civil Engineers
Sponsored by the Water Resources Engineering (Hydraulics) Division of ASCE. This collection contains 75 papers and 321 abstracts presented at conferences...
An Olympic Endeavor
Although some of the venues for the 2002 Winter Olympic Games in Salt Lake City, Utah, already exist, three sites in particular are either being built from scratch or will replace outdated...
Return to search