Nuclear Power Plant Delays: Probable Causes and Resolutions
The nuclear power industry in the United States is experiencing technological as well as construction and operation problems in nuclear facilities. It is the intent of this paper to review...
Structural Retrofit for Nuclear Power Plants
Retrofitting of nuclear power plants is a major concern these days. Recent rulings of regulatory agencies have affected most of the generating plants in some way. The lessons learned from...
Nuclear Outages: An Approach to Project Controls
The nuclear refueling outage is short-lived, fast paced, and very costly to the nuclear utility. To better control modification expenses and reduce outage-related costs, utilities are...
Modifications At Operating Nuclear Power Plants
In these days of continuing regulatory requirement changes and high interest rates, the engineering of structural modifications for operating nuclear power plants has taken on greater...
Modifying Piping Systems During a Plant Outage
This paper describes methods to reduce problems in design and planning of modifications to piping systems during a nuclear plant outage. Significant differences between original design...
Intact Decommissioning Alternative for Nuclear Power Plants
Previous studies of decommissioning options for nuclear power plants have examined potential alternatives such as immediate dismantlement, entombment, and moth-balling. This paper describes...
A Model for Nuclear Waste Shipping and Storage
A management option for spent fuel assemblies from nuclear power plants is storage in away-from-reactor (AFR) storage facilities. The purpose of this paper is to preseent a new mathematical...
Oconee Spent Fuel Rerack
Spent fuel storage problems facing electric utilities with nuclear generation are growing more critical as existing spent fuel storage capacity is utilized. Due to the inaccessibility...
Coping with Transition: Improving the Management Process
At Arkansas Power & Light Company, the Energy Supply Department has some 2,000 employees and operates (in addition to providing General Office engineering, technical, and administrative...
Project Management for the Upper Harlem Electrification Project
The Upper Harlem Electrification Project consists of a 28 mile extension of 700 V. D. C. under-running third (current carrying contact) rail electrification from North White Plains, New...
Seismic Probabilistic Risk Assessment for Critical Facilities
Probabilistic Risk Assessment (PRA) for seismic events is currently being performed for nuclear power plants. The background on seismic PRA is presented along with a basic description...
Crown Corporation Approach to Watershed Management
On July 1, 1984, the Government of Saskatchewan proclaimed the Water Corporation Act. The Act formed the legislative basis for the newly formed Saskatchewan Water Corporation and ushered...
Chaparral Watershed Management: A Systems Approach
The predicted environmental and economic effects of partial chaparral conversion for increased water yield on an experimental watershed in the Prescott National Forest, Arizona, are examined...
Mass. Municipal Watershed Management?Case Study
Most of the estimated 200,000 acres of municipally-owned watershed land in Massachusetts currently suffers from a lack of wise, multiple-use forest management which has resulted in lost...
Predicting Forest Snow Water Equivalent
In California, the snowpack of the Sierra Nevada provides more than one-third of the state's water needs. Regression models used to forecast this supply do not include measurement...
A Giardia Source Investigation in a National Forest Municipal Supply Watershed
For nearly 100 years, the City of Missoula, Montana, obtained most of its municipal water from a surface water supply, Rattlesnake Creek. The Rattlesnake watershed lies within the Lolo...
Electric Utility Noise Emissions
Environmental regulations require that impact statements for new electric utility and industrial power plants include an evaluation of noise emissions. Variations in equipment sound power...
Environmental Noise Control for Industrial Facilities
The authors present a brief discussion of the criteria used to evaluate environmental noise control problems. Then, they discuss environmental noise control in the power, petroleum, gas...
Computer Impacts on Water Resources Engineering
Computation capability has increased by a factor of one million over the past 30 years and has contributed greatly toward data management and the application of available technology to...
Maximum Water Source Utilization Using Lotus 1-2-3
This paper discusses the use of microcomputers to determine the optimum mix of sources for the Fargo-Moorhead area's water supply network. The area's major water...