Methodology for Optimization of Cascade Small Hydro
An accurate classification of small hydro sites is introduced. Class 'C' small hydro developments utilize favourable topographical and hydraulic gradients along...
Laser-2-Focus Flow Measurements in the Runner of a Bulb Turbine and Comparison with Calculation
Flow measurements are presented, which were carried out near and inside the 4-blade runner of an axial model bulb turbine of double adjustable type. These measurements were performed by...
New Concepts for Prelininary Hydropower Design
Hydropower generation on steep mountainous streams where storage is impractical can usually be made economical if: the flow duration curve shows sufficient energy available in the high...
Solar Ponds for Power and Water Quality Control
The status is provided on a solar pond test project in which the Bureau of Reclamation is involved in a cooperative effort with UTEP (The University of Texas at El Paso), Bruce Foods Corporation,...
Design and Manufacture of Turbine Runner Blades Using CAD/CAM-Technology
Interactive blade design, fluid flow analysis, stress analysis and NC-matching of both model and prototype blades are working from a common data base and are demonstrated in this paper....
Computerized Engineering for the Hydraulic Design of Hydro-Turbine Stay Vanes
To design a turbine stay vane as an integral part of the spiral case/stay vane/wicket gate waterpassage, both the vane geometry and the gate/vane position must be developed and analyzed....
Advance Prediction of Flow-Induced Variations
Frequency analysis of hydraulic vibrations has been applied using a transfer matrix and impedance method. The computer program is given for the self-excited and forced vibrations, together...
Open Flume Turbine Intake Geometry
An inexpensive physical hydraulic model was used to investigate the geometry of two different open flume turbine intakes. One intake utilized an inverted, fabricated pump bell type of...
Diffuser Performance for Draft Tube Applications
Available information on diffuser performance is summarized in relation to draft tube applications. This paper is particularly directed at the implications of basic research with these...
Hydraulic Machines Model Acceptance Tests
The article begins with a description of the modern test installations, giving the dimensions of the models most frequently used and the head heights. Attention is then given to the most...
Nanpil River Hydropower Project Pohnpei, Federated States of Micronesia
The Nanpil River Hydropower Project is a 1600 KW run-of-the-river hydropower project located on the tropical island of Pohnpei, Federated States of Micronesia. The hydropower project will...
Rapid Filling of Reservoirs
The rate of filling a reservoir, particularly for the first time, is governed by various factors. While economic considerations may favor rapid filling of reservoir to operational levels,...
Carmen-Smith Uprate & Modernization
The Carmen-Smith Powerhouse is located on the upper McKenzie River, 75 miles northeast of Eugene, Oregon. Carmen's two nearly identical 42. 1 MVA vertical hydroelectric turbine...
Analysis of Expanding the Wolf Creek Powerplant
The Nashville District, Corps of Engineers, is examining the feasibility of expanding the Wolf Creek powerplant to increase its peaking capability. The economic analysis of peaking expansions...
Renovation of the Shoshone Powerplant, Wyoming
Shoshone Powerplant and Buffalo Bill Dam are located on the Shoshone River approximately 5 miles (8. 1 km) west of Cody, Wyoming. The Powerplant was completed and the first two generating...
Siphon Penstock?An Economic Way to Develop Hydros
As part of the 48 MW Jim Falls Hydro Redevelopment Project by Northern States Power Company, a minimum flow powerhouse was constructed with a siphon penstock. The Minimum Flow Unit (MFU)...
The Twlefth Street Project?Multiple Uses on the Falls of the James River
This paper is about a hydroelectric project that was not built. The project is located in Richmond, Virginia on the James River. Project civil works, water rights and adjacent land are...
Negotiating Environmental Protection Measures with Resource Agencies: Twin Falls and Weeks Falls Hydroelectric Projects, Washington
The planning and licensing process for the Twin and Weeks Falls Projects involved resolution of numerous regulatory and environmental issues, including the need for cumulative impact analysis...
Fishery Issues Slow Boardman River Redevelopment
At issue was the requirement of the Michigan Department of Natural Resources (MDNR) and the U. S. Fish and Wildlife Service to require the establishment of fish ladders at the hydro sites....
Small-Hydro Development and Public Decisionmaking
This paper is based on a larger study (Soden, 1985), and employs concepts distilled from public choice theory - an increasingly well-accepted approach to the study of public policy and...
Return to search