Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...
St. George Habor?Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...
Application of Multibeam Echo Sounding and Side Scan Sonar for Mapping of Shoreline Protection Revetments
The use of multibeam survey methodology coupled with high precision positioning systems for the mapping of shoreline protection features and the adjacent offshore areas allows development...
Predicted Service Life of Armor Stone: A Case History
Laboratory testing for determination of true rock quality in terms of expected performance is not clear-cut, may be misleading, and requires extensive interpretation by an expert. This...
Big Idea
The reconstruction of the Big I�the intersection of interstate routes 25 and 40 in Albuquerque that was named for its appearance from the sky�was likely to disrupt commuters and interstate...
Raising the Bar - 345kV Uprating
The paper presents solutions to increasing the transfer capacity (book rating) of two critical 345kV tie lines. Described are computer modeling techniques using laser survey data coupled...
Effect of Aluminum Compression on ACSR Conductor Sags at High Operating Temperatures
Deregulation and restructuring are sweeping the electric utility industry in the United States. As a result, many utility engineers are analyzing, re-rating, and upgrading their most critical...
After the Flood
In June 2001, Tropical Storm Allison struck Texas, subjecting the Houston area to one of the most destructive floods in U.S. history. As part of the recovery effort, the Federal Emergency...
Geotechnical Aspects of Beach Restoration
Large-scale beach restoration undertaken by the U.S. Army Corps of Engineers in Florida requires millions of cubic yards of beach quality sand. Exploration for these sand resources starts...
Testing a Multi-Tiered Stress-Gradient Model for Risk Assessment Using Sediment Constituents from Coral Reef Environments
Coral reefs are threatened worldwide by stresses ranging from local to global in extent. Local stresses range from boat/ship groundings and sewage outfalls to dredging and coastal clearing....
Weighing the Options
A unique sludge pipeline replacement project in Colorado gave the engineers and the owner an opportunity to compare the merits of three different project delivery methods....
Ahead of the Curve
Four curved steel girder bridges for Pittsburgh's light-rail project posed challenges ranging from multiple site constraints to special rail loads and welded rail interactions....
Natural Progression
Engineers made storm-water detention, wetlands mitigation, and environmental safeguarding part and parcel of an industrial expansion project. Designers have created an inviting front yard...
Establishing Baselines For Pipeline Condition Master Planning
As our most of our cities approach complete built-out and much of our wastewater pipelines near the end of their design life, attention needs to be focused on retiring deteriorated first...
Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data
Development of the referenced Standard began in 1996. It is slated for publication in summer of 2002. The intent of this standard guideline is to present a system of classifying the quality...
Multifaceted Trenchless Rehabilitation at the Middletown, Ohio WWTP
This paper describes the multiple trenchless technologies that were evaluated and the ones that were applied to the rehabilitation of a 78la diameter corrugated metal influent line and...
A Major Water Main Crossing of the Ohio River at Cincinnati
This presentation chronicles a major water main crossing of the Ohio River at Cincinnati. The project is of interest because it provides for the interstate sale of drinking water and technical...
Capacity, Management, Operations and Maintenance (CMOM) Overview
Attendees will have a better understanding of the new policy and the benefits of compliance. The purpose of the CSO Rule or CMOM by EPA is creating a wave of activity across the country....
Geo-Strata
Focusing on geotechnical projects that use unique techniques and innovative processes, the magazine provides the everyday, real world details that geotechnical professionals need to know. Geo-Strata is...
Developing Your Team: Managerial Keys to Help Junior Staff Members Advance Their Careers
This chapter provides a guide for managers in helping junior staff advance their careers, including an overview of the simple steps the manager can take that will benefit the new engineer,...
Return to search