Relief of an Urban Storm Drainage System
The Peaks Branch storm sewer system was designed in the 1930s to drain 5.7 square miles of East Dallas. Subsequently, development blocked the emergency overflow paths and many areas are...
Analysis of Storm Sewers During Surcharge
A mathematical model based on a lumped system approach is presented to simulate unsteady flow in storm sewers during surcharge. The model equations and method of solution are presented....
Siting the New Boston Outfall: Near-Field Considerations
This paper describes a procedure applied in near-field considerations for siting the new outfall to serve the Massachusetts Water Resources Authority's (MWRA) proposed regional...
Uplift under Concrete Dams on Rock
While the possible existence of uplift pressures within dams and foundations is no longer questioned, there is still considerable controversy over the magnitude and distribution of uplift...
Uplift Pressure below Gravity Dams on Rock
The magnitude of the uplift force at the base of a concrete gravity dam founded on rock is strongly dependent on the properties of the discontinuities within the rock mass. This paper...
Effect of Seepage in Cracks in Older Gravity Dams
One of the many problems encountered by dam designers is that of estimating uplift pressures in cracks within older concrete dams. As part of ongoing research, we are investigating this...
Tunneling through an Existing Concrete Masonry Dam
The Gregory B. Jarvis Hydroelectric Project is located in Upper New York State on the West Canada Creek. Existing facilities include a non-overflow concrete gravity dam, 65 feet long and...
Safety Evaluation of PG&E Dams
Pacific Gas and Electric Co. (PG&E) owns and operates 71 hydroelectric power projects in Northern and Central California. With 115 dams in its system, PG&E is the largest...
Clay Joints in the Foundation of Dkhila Dam
The stability analysis performed at the beginning of construction, taking into account the shear test results of the foundation claystone showed insufficient safety factors against sliding....
Analysis of Concrete Gravity Dams Using Microcomputers
Monenco Consultants Limited has developed a microcomputer program entitled 'DS2' for the stability analysis of concrete gravity dams. This paper discusses this...
Evaluating Uplift Pressures for Concrete Gravity Dams
An approach for evaluating uplift and dam foundation conditions, which resulted from the initial phases of an Electric Power Research Institute (EPRI) study is presented. An earlier study...
Big Trouble in Little America
Traditionally, rural communities in the U.S. have relied on septic systems to treat their wastewater. Many of the nation's 23 million septic systems, however, are failing....
New Roof for an Aging Temporary
The wartime temporary design of a 1942 industrial building justified use of green timber for its roof trusses and higher than usual allowable design stresses. Some 45 years later, a new...
Rx for Dam Repair
Bernard asserts the growing importance of maintenance to extend the service life of dams as more and more of them reach or exceed their design lives. He describes renovations to Easton...
Affordable Housing and the Civil Engineer
The Joint Venture for Affordable Housing (JVAH) Demonstration. Program accomplished the goal and reduced the first time cost of housing by up to 30% through the use of innovative methods...
Roller-Compacted Concrete for Dams
This paper summarizes the findings of an investigative report on roller-compacted concrete dams prepared by Morrison-Knudsen Engineers, Inc. (MKE) under contract to the Electric Power...
Cedar Falls Project-Rehabilitation with RCC
This paper presents an overview of the planning, design, and construction considerations used during the development of the 9. 1 m (30-foot-high) Cedar Falls Roller Compacted Concrete...
Large Capacity Rock Anchors Stabilize Bagnell Dam
Evaluations of spillway discharge capacity and stability of structures for the Osage Hydroelectric Project indicated that the Project was unsafe during the occurrence of the Probable Maximum...
Hydro Combine Option for Lakhwar Project
A new concept of providing a power house cavity inside the traditional gravity dam section has been explored. Preliminary investigations indicate that taking into account all the relevant...
Geotechnical Exploration?Rio Bravo Hydro Project
In order for the Rio Bravo Hydroelectric Project to become a reality, a thorough evaluation of alternative project configurations was necessary. Various power canal shapes, sizes, and...
Return to search