Foundation Design for the Elevated Station
The Amundsen-Scott South Pole Station is located at an elevation of 2,850 m on the 3,200 m thick polar plateau, a field of ice and snow that is moving toward the ocean at a rate of 10...

The Construction Challenges
The varied SPRP construction and construction management complexities of the new South Pole are even more challenging because summer work must be carried out within a compressed window...

Phase II Evaluation Findings
The Segmental Concrete Channel Bridge System
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF Innovation Center. This report represents the second component of the...

Rebuilding a Railroad Bridge
The Peck Movable Bridge and Bridgeport Viaduct is a four-track crossing in Connecticut that serves three rail lines. The 1904 bridge had deteriorated, causing a kink that forced trains...

Bangkok Blockbuster
When completed, the 54-kilometer Bang Na-Bang Pli-Bang Pakong Expressway in Bangkok, Thailand, will be the longest elevated expressway in the world. The precast segmental method is being...

Equalizing Wet Weather Flows
Sanitary sewer overflows and combined sewer overflows can wreak havoc on communities by flooding basements, contaminating drinking water sources and recreational water bodies, and flowing...

Monitoring Construction Vibrations (Available in Geoenvironmental Special Issue only)
A review of procedures, criteria and equipment used to protect buildings and other structures from construction generated vibrations, the article begins by describing the importance of...

Betting on the Baseline (Available in Geoenvironmental Special Issue only)
In construction contracts, new deductive differing site conditions (DSC) clauses provide for credits to owners when contractors encounter better-than-anticipated subsurface conditions....

Walled In (Available in Geoenvironmental Special Issue only)
Of the many challenging aspects of the $10.8 billion, 7.5 mi long Central Artery Project in Boston, the construction of soldier pile, tremie concrete (SPTC) walls under the existing elevated...

Microtunneling under Honolulu
Highly congested urban utility corridors present some of the most difficult conditions for construction of new underground pipelines, especially when subsurface conditions are also very...

It's All in the Bracing
When the Massachusetts Bay Transportation Authority (MBTA) hired Weidlinger Associates Inc., Cambridge, Mass., to renovate the Aquarium Station stop along the subway system's...

High Rise Express (Available in Structural Engineering Special Issue only)
A new column system developed by the Canam Manac Group in Montreal offers the expediency of steel construction with the economy of concrete. The system is made entirely of lightweight...

Analysis, Design, Construction, and Testing of Deep Foundations
This proceedings, Analysis, Design, Construction, and Testing of Deep Foundations, consists of papers presented at the OTRC `99 Conference...

Materials and Construction
Exploring the Connection
This proceedings, Materials and Construction: Exploring the Connection, consists of papers presented at the 5th ASCE Materials Engineering...

Water, Water, Everywhere (Available in Geoenvironmental special issue only)
The discovery of extensive contamination just prior to construction of an underground library storage facility prompted engineers from the Minneapolis-based firms CNA Consulting Engineers...

Order Amid Uncertainty (Available in Geoenvironmental special issue only)
Bayesian statistical methods allow engineers to deduce probabilities from incomplete information. If there is a theoretical or empirical reason why a particular probability distribution...

Resolution Solutions
Disputes over such issues as change orders, extra work, delays, or defective work are an inescapable part of the construction process. By designing an effective dispute management program...

Program Management B.C.
Through a process of forensic analysis that applied modern-day technology to bridge the chasm of time, a team of construction managers with the international architecture/engineering/construction...

Sensitivity of Stormwater Conveyance System Cost to Design Recurrence Interval
(No paper) The cost of a piped and/or swaled stormwater system is determined principally by the storm recurrence interval (e.g., 5-year design storm) used to design it. That is, the present...

Title Transfer of U.S. Bureau of Reclamation Projects: Fact or Fiction
(No paper) The U.S. Bureau of Reclamation (Reclamation) has constructed hundreds of water storage and delivery projects throughout the 17 western United States. These projects vary in...

 

 

 

 