How to Work Effectively with Consulting Engineers
Getting the Best Project at the Right Price for Your Public Constituents
This manual is a comprehensive revision of the previous edition that addresses the procurement of engineering services for a quality project. It outlines the functions of the consulting...
Rising Tide
In an effort to accommodate a new light-rail system in New Jersey between Camden and Trenton, the state's Department of Transportation began the formidable task of enhancing...
Changing Lanes
The Rhode Island Department of Transportation (RIDOT) plans to relocate Interstate 195 in downtown Providence began as a safety improvement project but has since grown into an ambitious...
Water for Ahwatukee
Scheduled for completion in August, the South Mountain Water Facilities pipeline will increase drinking water capacity to the community of Ahwatukee Foothills, a rapidly growing south...
The Submarine Mission
A new Navy engineering and support facility for submarines has been designed and constructed at Lake Pend Oreille, near Bayview, Idaho. The project includes a bridge approach to the facility,...
Physical Model of Current-Induced Scour at Ventura Harbor
This paper describes a 1:25-scale movable-bed physical model study of scour resulting from longshore current passing through a narrow gap on the leeside of the detached breakwater at Ventura...
Berm Breakwaters?Design, Construction and Monitoring
The philosophy of the fieldwork of Berm breakwaters was applied in Iceland. A few case histories were described with emphasis on quarry investigations, design, construction and monitoring....
Comparison of Hydrodynamic Parameters for a Floating Breakwater
The U. S. Army Engineer Research and Development Center is in the process of developing a Rapidly Installed Breakwater System (RIBS) for use in Joint Logistics Over the Shore Operations...
In Situ Behavior of Breakwaters in Constantza Port?Romania
In order to build breakwaters, especially in the areas with heavy storms, a special analysis on the several factors is necessary. In addition, surveillance of time behavior of breakwaters...
Montioring and Modeling of Tandem Breakwater System at Hammond, IN
A tandem breakwater system was constructed in 1989-90 to provide protection for a large marina at Hammond, IN, at the south end of Lake Michigan. A five year monitoring program (1993-98),...
Design and Construction of the Pier J Breakwaters at the Port of Long Beach, California
Several different alternatives to mitigate surge activity were investigated. The most acceptable solution was a pair of new breakwaters that altered the basin geometry to change the basin...
Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...
St. George Habor?Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...
Applications of Multibeam Echo Sounding with Topographic Mapping for Monitoring of Rubble Mound Breakwaters
Analysis of data from the breakwater monitoring program indicates the integration of multibeam survey capability with the increased accuracy of OTF DGPS positioning and advanced data management...
Application of Multibeam Echo Sounding and Side Scan Sonar for Mapping of Shoreline Protection Revetments
The use of multibeam survey methodology coupled with high precision positioning systems for the mapping of shoreline protection features and the adjacent offshore areas allows development...
Predicted Service Life of Armor Stone: A Case History
Laboratory testing for determination of true rock quality in terms of expected performance is not clear-cut, may be misleading, and requires extensive interpretation by an expert. This...
Big Idea
The reconstruction of the Big I�the intersection of interstate routes 25 and 40 in Albuquerque that was named for its appearance from the sky�was likely to disrupt commuters and interstate...
After the Flood
In June 2001, Tropical Storm Allison struck Texas, subjecting the Houston area to one of the most destructive floods in U.S. history. As part of the recovery effort, the Federal Emergency...
Geotechnical Aspects of Beach Restoration
Large-scale beach restoration undertaken by the U.S. Army Corps of Engineers in Florida requires millions of cubic yards of beach quality sand. Exploration for these sand resources starts...
Testing a Multi-Tiered Stress-Gradient Model for Risk Assessment Using Sediment Constituents from Coral Reef Environments
Coral reefs are threatened worldwide by stresses ranging from local to global in extent. Local stresses range from boat/ship groundings and sewage outfalls to dredging and coastal clearing....
Return to search