Passing the Public Works Buck
Users and beneficiaries of local and state public works projects are paying a larger share of their cost. State and federal grants and general local revenues are being relied on less....
Real Time Data Acquisition in Structural Testing
The process of data collection in real time for structural engineering can be generalized into a process called the real time sequence. The sequence has three major phases: preliminary...
Modeling Construction Operations in the Classroom
Students in construction management need to be exposed to the dynamics of the construction site and become familiar with the interaction of resources. In addition, the student needs to...
Construction Information and Applications Systems in Education
Designers are utilizing relatively sophisticated software but constractors, except for the largest companies, are limited to the most basic business applications. Integrative use of computers...
Microcomputers in Construction Education
This paper presents a number of special applications programs developed by Clemson University civil engineering graduate students. The programs are currently being used in both undergraduate...
Computer Systems for Construction Materials Management
Materials management computer systems store, sort, combine and print data files pertaining to materials requisitions, purchase orders, vendor evaluations, and warehouse inventories. The...
SIMSUPER5: Tunneling Construction Simulation
This paper presents SIMSUPER5 (SIMulation SUPERvisor version 5) a computer program developed to simulate the tunnel construction process under conditions of uncertainty. The program determines...
Computerized Construction Cost Estimating in County Government
Prior to establishment of a computerized contruction cost estimating system, four engineering divisions within the Department of Public Works in Fairfax County, Virginia, performed some...
Observations on Future Computerized Construction Research
A National Science Foundation sponsored workshop recently convened at the University of Illinois to help construction industry professionals determine the research needs and opportunities...
Army Life Cycle/Maintenance Prediction Model
The U. S. Army Construction Engineering Research Laboratory (USA-CERL) has developed a facility maintenance prediction model for the Department of the Army. This simulation model will...
Expert Systems in Construction Management: Microcomputer Application
Microcomputer based expert systems will assist construction industry by: changing the construction manager's role from day-to-day decision making to strategic planning and...
A Knowledge Based Technique for Structural Component Design Programs
Traditionally, computer programs written for the purpose of sizing and checking standards compliance of individual structural members have been authored in high level compiled languages...
A Demonstration Expert System to Aid in Assessing Groundwater Contaminating Potential by Organic Chemicals
An expert systems approach to evaluating mobility and degradation of organics in soil systems is compared to conventional programming techniques. An expert system has been developed in...
Construction Resource Analysis Using Symphony
In 1983, the Air Force was directed to commence engineering design of a small, single warhead ICBM for potential deployent in the early 1990's. As construction agent for the...
Computerized Construction Progress Control
In 1983 and 1984, an exploratory tunnel was constructed as part of the geotechnical exploration program for two highway tunnels to be constructed for interstate 70 through Glenwood Canyon,...
Advanced Microcomputer Simulation for Construction Managers
The concept of simulation allows the analysis of complex and dynamic systems such as those encountered in construction operations. In particular, the technology orientation of construction...
Microcomputer Expert Systems for Welded Construction
Stone & Webster Engineering Corporation has developed expert systems including various applications within the field of welded construction. Systems have been developed in the...
The Engineering Workstation at Skidmore, Owings & Merrill
The computer group at Skidmore, Owings & Merrill has developed a unique workstation environment which aids both the generation of information in the design phase, as well as the...
A Method for Computerized Site Characterization
Site characterization, the process of evaluating subsurface soil, rock, and groundwater conditions and their impact on project design and construction is a common element in every major...
Failures: Who Did It - How Did It Happen?
The forensic engineer investigates the cause of failures and determines, from an engineering viewpoint, who was responsible for that failure. These failures need not be catastrophic but...
Return to search