Techniques of Negotiation
Three primary qualities are necessary for effective negotiation: knowledge, attitude, and skill. The author's firm has successfully used a negotiating team approach. This...

Embankment Seepage Control Design and Construction
For seepage control features of embankment dams, design criteria and construction practice is reviewed as it is reflected in the experience of the U. S. Army Corps of Engineers. The generally...

Application of a Three-Dimensional Coupled Finite Element?Boundary Element Method
Three-dimensional conditions in underground construction occur at the face of a tunnel, at intersections of underground openings and around roughly equidimensional openings. As long as...

Prediction of Highway Construction Noise Levels
A model for the prediction of noise levels from highway construction operations has been developed under sponsorship of the Federal Highway Administration (FHWA). Noise sources are geometrically...

Noise and Air Blast from Construction Blasting
Noise generated by construction blasting differs from other construction noise because of its frequency content. The audible high frequency portion is accompanied by a non audible, lower...

Cost Assessment of Construction Noise Control
The results of a series of studies have provided noise control engineers with a method to estimate off-site construction noise levels and the cost of reducing these to acceptable levels....

Noise Assessment, Measurement, and Mitigation, an OSHA View
A discussion is presented on the Occupational Safety and Health Administration (OSHA) 29 CFR 1910. 95 General Industry noise exposure standards and the 29 CFR 1926. 52 and 1926. 101 Construction...

A Tale of Six Cities
Battle Creek is a four mile urban stream that had an erosion problem that was accelerating with urbanization of its watershed. Erosion created unstable ravine slopes over 60 feet high,...

Proposed Design Criteria for Composite Steel Deck Slabs
Composite steel deck slabs have continued to gain popularity; today they are one of the predominant means of floor slab construction in most typical buildings. The term 'composite...

Composite Bridge Design in Germany
A span length between 40 m and 12 m has been regarded as optimal up to the mid-60's for a composite design to compete with prestressed concrete or steel alternatives. With...

Dynamic-Fatigue Response of Continuous Composite Bridges
The dynamic response of continuous composite bridges and the influence of fatigue loading at resonance frequency on the structural response are investigated. It is shown that cracking...

A History of Adhesive Bonded Composite Members
The history and development of adhesive bonding in composite members is traced. Two forms of composite members are explained. Research from different parts of the world is compared. Applications...

Mixed Systems: Past Practices, Recent Experience, and Future Direction
A comparison is made between composite column capacities derived from the authors procedure utilizing the ACI (America Concrete Institute) code requirements, and previously published semi-empirical...

Recent Developments in Mixed Steel-Concrete Systems
Mixed steel-concrete systems have emerged into a well established new system that can be used as readily as either steel or concrete systems for high-rise buildings. Mixed systems offer...

Bond Stress of Embedded Steel Shapes in Concrete
This paper describes an investigation into the bond stress developed between steel shapes and reinforced concrete when the concrete is lightly stressed. A brief discussion of previous...

Recent Developments for Composite Buildings in Japan
Research work and construction practice of composite steel and reinforced concrete structural systems in Japan are reviewed, based on the data gathered by the working group of the Architectural...

Composite Columns?Design and Examples for Construction
The new German standard DIN 18806, part 1 gives the rules for the design of composite columns. The general method, taking into account all the inhomogeneties of the two materials steel...

Seminar Summary and Research Needs
All the papers presented in the technical sessions of the seminar are summarized and, in some cases, commented upon. The needed research in composite and mixed construction is described....

Reshaping the Future of Plastic Buildings
Plastic structures have been around for 40 years, but have for the most part been showcases with little use in the mainstream of the building industry. To be used effectively, plastics...

Building on Muck
The Craney Island Disposal Area at Norfolk, Va. is a 2,500 acre depository for material dredged from ports and channels in the Hampton Roads. The U.S. Army Corps of Engineers extended...

 

 

 

 