Undeveloped Hydropower Resource Potential
The public hearings conducted as part of the National Energy Strategy produced testimony that concluded that the potential for development of hydropower was not well defined. As a result,...
Private Hydropower Projects: Exporting the American Experience
This paper addresses different aspects of exporting the American knowledge and experience in the private development of small-scale hydropower projects. It details the 'export'...
Technology Transfer for Small Hydro
The wide range of different definitions of what constitutes a small hydroelectric power plants is discussed and the conclusion is drawn that this definition should be based more on the...
Small Hydro Site Ranking, Cost Methodology and Program
The user-friendly micro-computer program SHYDRO for costing small hydro has been prepared for the government of Canada and is available in the public domain. SHYDRO was initially applied...
Load/Resource Matching for Period-of-Record Computer Simulation
The Southwestern Power Administration (Southwestern), an agency of the Department of Energy, is responsible for marketing the power and energy produced at Federal hydroelectric power projects...
Computer Modeling of Reservoir Sedimentation and Sluicing
A recently developed computer program which simulates the evolution, growth, and movement of a submerged delta in reservoirs was tested for Spencer Dam and Reservoir in Nebraska. The code,...
Decision Rules for Reservoir Releases
One of the problems faced with computer modeling of a multi-reservoir, hydro-power system is making decisions on how releases will be made. Reservoirs many times have multiple demands...
Development of a New Hydraulic Design Tool for Spiral Casing/Distributor Geometry
A novel computational model has been developed to predict highly complex turbulent flow in a combined spiral casing/distributor geometry. Validation of the computational model against...
Optimal Real-Time Control of Hydroelectric Power Plant Using Dynamic Programming
In this paper, an approach of optimal real-time control of hydroelectric power plant operations is presented. The methodology is based on a dynamic programming technique where the original...
Hand Held Powerhouse Control Console or Portable Data Terminal
The Portable Data Terminal (PDT) is a very small light weight hand held computer terminal that communicates with the control system computer by radio. An operator monitors power plant...
A Hydroelectric Plant Operator's Assistant
This paper describes a PC based application designed to assist in the process of enhancing the performance of multi-unit hydroprojects. Optimization considerations, uses of the Operator's...
Ferroresonance & the Snettisham Hydroelectric Project
Key system features of the Snettisham power plant in Alaska will be highlighted along with a discussion of the operational problems encountered due to a ferroresonant condition. The project...
Voltage Regulator Influence on Generator System Stability
During initial startup of a generator system, it is not uncommon to witness generator voltage instability. Most of the time, the solution is reduced to returning the stability control...
Validation Studies on Indexed Sequential Modeling for the Colorado River Basin
A method called indexed sequential modeling (ISM) has been developed by the Western Area Power Administration to estimate reliable levels of project dependable power capacity (PDC) and...
Operation of Hydropower Plants Considering Daily Streamflows
Operation of hydropower plants is a sequential decision process often modeled as a dynamic programming problem. Typically, such formulations consider monthly stages assuming that monthly...
Consideration of Sedimentation on Hydropower Projects
Experience gained by analysis of a number of hydropower projects throughout the world leads to the conclusion that it is necessary to consider sediment related aspects in the design and...
Examples of Risk Assessment in Dam Safety Decision Making
Three examples of risk-based dam safety evaluations performed for dam users or operators are summarized. These studies were conducted by major U.S. engineering firms and involved experienced...
Rehabilitation of the Dams at the Crescent and Vischer Ferry Hydroelectric Projects
This paper reviews the dam rehabilitation design and construction techniques used at the New York Power Authority's Crescent and Vischer Ferry Dams. The following are the...
Civil Design of the Sidney A. Murray Jr. Hydroelectric Station
This paper addresses the general civil design of the Sidney A Murry Jr Hydroelectric Station with special emphasis on the design requirements of the project's unconventional...
Evaluating History?The Edison Sault Powerhouse
The hydroelectric facility owned by the Edison Sault Electric Company at Sault Ste Marie, Michigan was an engineering marvel when it was designed and constructed. This paper explores the...
Return to search